1. Project Summary
GujRERA — 10 Ahmedabad Construction Sites
Compiled: 02-11-2026
Projects covered: 10
Source: https://gujrera.gujarat.gov.in/#/project-preview (public data, no login)
Each section below is the complete record published on the GujRERA project page — Project Summary, Project Profile, Promoters and Progress & RERA Actions — plus an index of every attached document, all of which were downloaded next to this report.
Index
| # |
Project |
GujRERA Reg. No. |
Taluka |
Type |
Declared End |
Progress |
Report |
| 1 |
ETERNITY BY RATNAAKAR |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA11871/300523 |
Ahmedabad City |
Residential/Group Housing |
31-07-2028 |
2% |
open |
| 2 |
MARUTI 360 |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12039/280623 |
Ahmedabad City |
Residential/Group Housing |
30-04-2029 |
2% |
open |
| 3 |
The Sovereign |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12448/131023 |
Ahmedabad City |
Residential/Group Housing |
31-12-2029 |
2% |
open |
| 4 |
WESTLANDS |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A2R/210726/300927 |
Ahmedabad City |
Residential/Group Housing |
30-01-2028 |
2% |
open |
| 5 |
SHYASWA SAROVAR |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA13078/050324/311229 |
Ahmedabad City |
Residential/Group Housing |
30-04-2030 |
2% |
open |
| 6 |
H7 |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA14549/A1R/121125/120228 |
Ahmedabad City |
Mixed Development |
12-02-2028 |
2% |
open |
| 7 |
NAVRATNA GULMOHAR PARK |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16224/181225/311232 |
Ahmedabad City |
Mixed Development |
30-04-2033 |
2% |
open |
| 8 |
SWASTIK DEVKUNJ |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16160/281125/310329 |
Ahmedabad City |
Mixed Development |
31-07-2029 |
2% |
open |
| 9 |
SINDUR VIENNA |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA16457/110226/310728 |
Ahmedabad City |
Residential/Group Housing |
30-11-2028 |
2% |
open |
| 10 |
Godrej Altus |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16636/240326/071131 |
Ahmedabad City |
Mixed Development |
07-11-2031 |
2% |
open |
Snapshot Comparison
| # |
Project |
Est. Project Cost (₹) |
Units |
Booked |
Un-booked |
QPR Filed |
Docs |
| 1 |
ETERNITY BY RATNAAKAR |
2,27,94,78,301 |
57 |
25 |
32 |
14/22 |
23 |
| 2 |
MARUTI 360 |
4,47,56,12,610 |
124 |
82 |
42 |
14/25 |
40 |
| 3 |
The Sovereign |
3,97,23,42,746 |
102 |
12 |
90 |
11/27 |
22 |
| 4 |
WESTLANDS |
85,00,00,000 |
59 |
48 |
11 |
12/20 |
29 |
| 5 |
SHYASWA SAROVAR |
99,00,00,000 |
80 |
43 |
37 |
11/27 |
39 |
| 6 |
H7 |
14,72,00,000 |
5 |
5 |
0 |
7/16 |
43 |
| 7 |
NAVRATNA GULMOHAR PARK |
3,75,82,00,000 |
170 |
0 |
170 |
3/31 |
22 |
| 8 |
SWASTIK DEVKUNJ |
15,00,00,000 |
122 |
84 |
38 |
4/17 |
33 |
| 9 |
SINDUR VIENNA |
12,00,00,000 |
1 |
0 |
1 |
2/11 |
46 |
| 10 |
Godrej Altus |
2,85,36,27,508 |
148 |
0 |
148 |
2/23 |
28 |
ETERNITY BY RATNAAKAR
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA11871/300523
Project ID: 18946
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Residential/Group Housing
Promoter: NCPL BUILDSPACE LLP (LIMITED LIABILITY PARTNERSHIP FIRM)
Registered On: 30-05-2023
Declared Completion: 31-07-2028
Construction Progress (as published): 2% (ill)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:17
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
ETERNITY BY RATNAAKAR |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA11871/300523 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/GUJRERA/230510/014595 |
| Project Address |
Eternity by Ratnaakar, Opp. Ashok Vatika BRTS Bus Stop Ambali-Bopal Road, |
| Moje / Village |
— |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
Gujarat |
| Pin Code |
— |
| Project Type |
Residential/Group Housing |
| About Property |
This project is residential Project having 57 flats |
| Project Start Date |
13-04-2023 |
| Project End Date |
31-07-2028 |
| Project Land Area (sq m) |
3850 |
| Total Open Area (sq m) |
2234.7 |
| Total Covered Area (sq m) |
1539.05 |
| Total Carpet Area (sq m) |
19410.03 |
| Carpet Area Range (sq m) |
296.93 – 625.55 |
| Total Units |
57 |
| Plan Passing Authority |
AUDA |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS — · Block — · TP — (—) · FP — |
| Project Status |
New |
| Project Cost (₹) |
₹ 2,27,94,78,301 (declared on portal) |
| Unit Price Range (₹) |
₹ 3,65,83,750 – ₹ 9,04,67,082 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Residential |
1 |
57 |
25 |
32 |
19410.03 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| 1 |
25 |
32 |
43.86 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
NCPL BUILDSPACE LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AAUFN2930L |
| Registration No. |
ABB9492 |
| Office Address |
801-802, REGENCY PLAZA, ANANDNAGAR CROSS ROAD SATELLITE Ahmedabad City Ahmedabad Gujarat 380015 |
| E-mail |
eternity.rera@ratnaakar.com |
| Mobile |
9979851444 |
| Partners / Associates |
2 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
22 |
| Total Complied Quarters |
14 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
3 |
| Total Complied Annual Compliance |
3 |
| Total Annual Compliance Defaulted |
0 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
ICICI BANK LIMITED |
| Branch |
AHMEDABAD - 100 FEET ROAD |
| Account Name |
NCPL BUILDSPACE LLP COLLECTION RERA AC FOR ETERNITY BY RATNAAKAR |
| Account Number |
058605005596 |
| IFSC |
ICIC0000586 |
| District / Taluka |
Ahmedabad / Ahmedabad City |
| Pincode |
380015 |
1.6 Construction Booking Status
| Block |
Block Progress (%) |
Form-B Report (%) |
Un-booked Units |
Development Period |
| 1 |
0 |
0 |
32 |
13-06-2019 → 30-12-2021 |
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA11871/300523 |
29-04-2023 |
30-05-2023 |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2023-24 |
164283 |
17-09-2024 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2024-25 |
164283 |
17-10-2025 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2025-26 |
164283 |
08-10-2026 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| LEGAL_PCWF |
LEGAL/0000255/28022024 |
28-02-2024 |
23-03-2024 |
— |
— |
Approved |
— |
— |
— |
| LEGAL_PCWF |
LEGAL/0001262/13022025 |
13-02-2025 |
17-03-2025 |
— |
— |
Approved |
— |
— |
— |
| BCR |
BCR/0003076/08012025R2 |
08-01-2025 |
13-01-2025 |
— |
— |
Approved |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| 1 |
98,00,00,000 |
26,35,48,000 |
27 |
71,64,52,000 |
31-08-2024 |
| Form 2-B — common infrastructure |
4,18,00,000 |
0 |
0 |
4,18,00,000 |
31-08-2024 |
| Total |
1,02,18,00,000 |
26,35,48,000 |
25.79 |
75,82,52,000 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
Eternity by Ratnaakar, Opp. Ashok Vatika BRTS Bus Stop Ambali-Bopal Road, |
| Moje |
— |
| Revenue Survey No. |
— |
| City Survey No. |
— |
| Block No. |
— |
| TP / Scheme |
— / — |
| Final Plot No. |
— |
| Approving Authority |
AUDA |
| Land Area for Project (sq m) |
3773.75 |
| Total Land Area of Layout (sq m) |
3850 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
78 / 7517.36 |
| Parking for Sale (nos) |
0 |
| Open Parking Area (sq m) |
0 |
| Map Coordinates |
23.027787880353067, 72.49492300037791; 23.027787880353067, 72.49521536116053; 23.02731146328702, 72.49515903477122; 23.027358364523682, 72.49478352550913; 23.027792817308665, 72.4949203181689 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Not published |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
— |
| Swimming Pool Capacity |
— |
| Water Supply Flag |
— |
| Sewage Disposal Flag |
— |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| RESIDENTIAL |
57 |
— |
19410.03 |
2266.23 |
411.09 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| VIDHI S GAJJAR |
CA/2018/103740 |
account@adsapl.in |
15 |
15 |
A?24, VISHWAKARMA VIHAR SOCIETY, JODHPUR CORSS ROAD, SATELLITE, |
CONFIRMED |
Structural Engineer(s)
| Name |
Licence No. |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| Naresh K Shah |
001SE20082600092 |
contact@nkshah.com |
2600 |
2600 |
A-1209, Mondeal Heights, Besides Novotel hotel Sarkhej - Gandhinagar Hwy |
CONFIRMED |
Chartered Accountant(s)
— (no records)
Contractor(s)
— (no records)
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| 1 |
13-04-2023 |
31-03-2028 |
— |
— |
— |
— |
— |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
270071 |
| Form Status |
UPLOADED |
| Architect |
VIDHI SATISHBHAI GAJJAR |
| COA Registration No. |
— |
| Valid Till |
— |
| Physical Site Visit Date |
— |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
13-04-2023 |
| Project End |
31-03-2028 |
| Remark |
— |
| Submitted On |
— |
Form 1-A — Work Completed per Block
| Block |
Progress (%) |
Floors |
Lifts |
Units Booked |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| 1 |
31.05 |
21 |
7 |
25 |
100 |
100 / 3 |
0 |
1.75 |
73.68 / 22 |
23.81 |
66.67 |
0 |
0 |
0 |
Form 1-A — Construction Schedule: Block 1
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
29-08-2023 |
26-01-2024 |
03-12-2023 |
23-06-2024 |
| Plinth |
27-01-2024 |
31-07-2024 |
21-06-2024 |
16-07-2025 |
| Podium |
— |
— |
— |
— |
| Stilt |
— |
— |
— |
— |
| Slab / RCC |
01-08-2024 |
31-03-2026 |
— |
— |
| Internal Finishing |
01-12-2024 |
31-12-2026 |
13-06-2024 |
31-01-2026 |
| Sanitary Fittings |
01-01-2027 |
31-12-2027 |
— |
— |
| Staircase |
01-08-2024 |
31-05-2026 |
— |
— |
| External Development |
01-05-2026 |
31-05-2027 |
08-05-2025 |
31-05-2027 |
| Installation |
01-11-2026 |
31-08-2027 |
— |
— |
| Common Area |
01-09-2027 |
31-12-2027 |
31-03-2027 |
31-12-2027 |
1 site progress photograph attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
201439 |
| Form-B Period |
01-09-2027 → 31-12-2027 |
| Form-B Reported Progress (%) |
0 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
| Internal Road |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Water Supply |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Sewerage |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Storm Water Drains |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Landscaping |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Street Lighting |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Community Buildings |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Treatment And Disposal |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Solid Waste Management |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Water Conservation |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Energy Management |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Fire Protection |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Electrical Meter Room |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Fire Fighting |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Drinking Water Facilities |
NO |
— |
— |
0 |
| Emergency Evacuation |
NO |
— |
— |
0 |
| Use Of Renewable Energy |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Security |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Letter Box |
YES |
01-09-2027 |
31-12-2027 |
0 |
| Compound Wall |
YES |
— |
— |
0 |
| Plinth Protection |
YES |
— |
— |
0 |
| Water Tank |
YES |
— |
— |
0 |
| Other Requirement |
YES |
— |
— |
0 |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| 1 |
201 |
Residential |
296.93 |
35 |
UNBOOKED |
4,37,95,368 |
0 |
4,37,95,368 |
Created |
| 1 |
202 |
Residential |
297.01 |
35 |
UNBOOKED |
4,38,05,924 |
0 |
4,38,05,924 |
Created |
| 1 |
203 |
Residential |
391.58 |
42.33 |
UNBOOKED |
5,72,50,771 |
0 |
5,72,50,771 |
Created |
| 1 |
301 |
Residential |
296.93 |
35 |
UNBOOKED |
4,37,95,368 |
0 |
4,37,95,368 |
Created |
| 1 |
302 |
Residential |
297.01 |
35 |
UNBOOKED |
4,38,05,924 |
0 |
4,38,05,924 |
Created |
| 1 |
303 |
Residential |
391.58 |
42.33 |
BOOKED |
4,22,50,000 |
4,22,50,000 |
0 |
Released |
| 1 |
401 |
Residential |
296.93 |
35 |
UNBOOKED |
4,37,95,368 |
0 |
4,37,95,368 |
Created |
| 1 |
402 |
Residential |
297.01 |
35 |
BOOKED |
4,53,25,000 |
1,45,85,460 |
3,07,39,540 |
Released |
| 1 |
403 |
Residential |
391.58 |
42.33 |
UNBOOKED |
5,72,50,771 |
0 |
5,72,50,771 |
Created |
| 1 |
501 |
Residential |
296.93 |
35 |
UNBOOKED |
4,37,95,368 |
0 |
4,37,95,368 |
Created |
| 1 |
502 |
Residential |
297.01 |
35 |
BOOKED |
4,53,25,000 |
1,45,85,460 |
3,07,39,540 |
Released |
| 1 |
503 |
Residential |
391.58 |
42.33 |
BOOKED |
4,98,55,000 |
42,85,714 |
4,55,69,286 |
Released |
| 1 |
601 |
Residential |
296.93 |
35 |
BOOKED |
3,82,02,500 |
2,23,66,411 |
1,58,36,089 |
Released |
| 1 |
602 |
Residential |
297.01 |
35 |
UNBOOKED |
4,38,05,924 |
0 |
4,38,05,924 |
Created |
| 1 |
603 |
Residential |
391.58 |
42.33 |
UNBOOKED |
5,72,50,771 |
0 |
5,72,50,771 |
Created |
| 1 |
701 |
Residential |
296.93 |
35 |
BOOKED |
3,82,02,500 |
20,00,000 |
3,62,02,500 |
Released |
| 1 |
702 |
Residential |
297.01 |
35 |
UNBOOKED |
4,38,05,924 |
0 |
4,38,05,924 |
Created |
| 1 |
703 |
Residential |
391.58 |
42.33 |
BOOKED |
4,98,55,000 |
4,22,50,000 |
76,05,000 |
Released |
| 1 |
801 |
Residential |
296.93 |
35 |
UNBOOKED |
4,37,95,368 |
0 |
4,37,95,368 |
Created |
| 1 |
802 |
Residential |
297.01 |
35 |
BOOKED |
3,82,02,500 |
1,43,44,784 |
2,38,57,716 |
Released |
| 1 |
803 |
Residential |
391.58 |
42.33 |
BOOKED |
5,72,50,771 |
3,64,17,834 |
2,08,32,937 |
Released |
| 1 |
901 |
Residential |
296.93 |
35 |
BOOKED |
3,82,02,500 |
3,23,59,586 |
58,42,914 |
Released |
| 1 |
902 |
Residential |
297.01 |
35 |
BOOKED |
3,65,83,750 |
2,19,43,059 |
1,46,40,691 |
Released |
| 1 |
903 |
Residential |
391.58 |
42.33 |
UNBOOKED |
5,72,50,771 |
0 |
5,72,50,771 |
Created |
| 1 |
1001 |
Residential |
296.93 |
35 |
BOOKED |
4,37,95,368 |
1,60,39,374 |
2,77,55,994 |
Released |
Showing first 25 of 57 units — full list in raw/form_three.json.
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
NCPL BUILDSPACE LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AAUFN2930L |
| Company / Firm Registration No. |
ABB9492 |
| Date of Incorporation |
02-08-2022 |
| Status |
REGISTERED |
| Registered Address |
801-802, REGENCY PLAZA, ANANDNAGAR CROSS ROAD SATELLITE |
| Taluka / District / State |
Ahmedabad City / Ahmedabad / Gujarat |
| Pin Code |
380015 |
| E-mail |
eternity.rera@ratnaakar.com |
| Mobile |
9979851444 |
| Telephone |
— |
| Website |
https://gujrera.gujarat.gov.in/#/ |
| Registered On |
19-01-2024 |
3.2 Developer Group / Track Record
| Field |
Value |
| Developer Group |
NCPL BUILDSPACE LLP |
| Promoter Enterprise |
LIMITED LIABILITY PARTNERSHIP FIRM |
| Total Projects |
0 |
| Projects Completed |
0 |
| Ongoing Projects |
1 |
| Total Area Constructed |
0 |
| Experience in Gujarat |
0 |
| Experience in Other States |
0 |
| Group History |
0 |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| NISHANT UPENDRA SHAH |
APOPS1052B |
9979851444 |
eternity.rera@ratnaakar.com |
801-802, REGENCY PLAZA, ANANDNAGAR CROSS ROAD SATELLITE |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
| UPENDRA CHINUBHAI SHAH |
AIOPS3732M |
9979851444 |
rera@ratnaakar.com |
801-802, REGENCY PLAZA, ANANDNAGAR CROSS ROAD SATELLITE |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
2 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| NISHANT UPENDRA SHAH |
APOPS1052B |
9979851444 |
eternity.rera@ratnaakar.com |
801-802, REGENCY PLAZA, ANANDNAGAR CROSS ROAD SATELLITE |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| ETERNITY BY RATNAAKAR |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA11871/300523 |
Residential/Group Housing |
New |
NCPL BUILDSPACE LLP |
13-04-2023 |
31-07-2028 |
Ahmedabad |
Ahmedabad City |
| — |
— |
— |
— |
— |
— |
— |
Ahmedabad |
— |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Pincode |
Opening Balance (₹) |
Closing Balance (₹) |
| ICICI BANK LIMITED |
AHMEDABAD - 100 FEET ROAD |
NCPL BUILDSPACE LLP RETENTION RERA AC FOR ETERNITY BY RATNAAKAR |
058605005598 |
ICIC0000586 |
Ahmedabad / Ahmedabad City |
380015 |
0 |
0 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
27 |
| Time Lapsed (%) |
26.45 |
| RERA Assessment |
ill |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| October 2023 |
2.55 |
| January 2024 |
14.02 |
| April 2024 |
15.05 |
| July 2024 |
24.22 |
| October 2024 |
26.39 |
| October 2025 |
41.8 |
| January 2026 |
50.83 |
| April 2026 |
54.87 |
| July 2026 |
56.61 |
| October 2026 |
63.41 |
4.3 Block-wise Construction Progress
| Block |
Development Start |
Development End |
Block Progress (%) |
Form-B Report (%) |
Form-B Period |
| 1 |
13-06-2019 |
30-12-2021 |
0 |
0 |
13-06-2019 → 30-12-2021 |
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
May-23 – Sep-23 |
07-09-2023 |
07-10-2023 |
04-10-2023 |
SUBMITTED |
— |
— |
— |
— |
| Q-2 |
Sep-23 – Dec-23 |
31-12-2023 |
21-02-2024 |
15-02-2024 |
SUBMITTED |
YES |
— |
— |
— |
| Q-3 |
Jan-24 – Mar-24 |
31-03-2024 |
22-04-2024 |
12-04-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-4 |
Apr-24 – Jun-24 |
30-06-2024 |
07-07-2024 |
03-07-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-5 |
Jul-24 – Sep-24 |
30-09-2024 |
07-10-2024 |
10-09-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-6 |
Oct-24 – Dec-24 |
31-12-2024 |
10-01-2025 |
06-01-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-7 |
Jan-25 – Mar-25 |
31-03-2025 |
07-04-2025 |
02-04-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-8 |
Apr-25 – Jun-25 |
30-06-2025 |
07-07-2025 |
02-07-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-9 |
Jul-25 – Sep-25 |
30-09-2025 |
07-10-2025 |
01-10-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-10 |
Oct-25 – Dec-25 |
31-12-2025 |
07-01-2026 |
02-01-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-11 |
Jan-26 – Mar-26 |
31-03-2026 |
07-04-2026 |
01-04-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-12 |
Apr-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
02-07-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-13 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
01-10-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-14 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
ACTIVE |
— |
— |
— |
— |
| Q-15 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-16 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-17 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-18 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| X-1 |
Jan-28 – Mar-28 |
31-03-2028 |
07-04-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| BWA-1 |
Mar-25 – Mar-25 |
30-03-2025 |
30-03-2025 |
28-03-2025 |
SUBMITTED |
— |
— |
— |
— |
| X-2 |
Apr-28 – Jun-28 |
30-06-2028 |
07-07-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Jul-28 – Jul-28 |
31-07-2028 |
31-07-2028 |
— |
ACTIVE |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2023-24 |
SUBMITTED |
17-09-2024 |
Form 5 PDF |
| 2024-25 |
SUBMITTED |
17-10-2025 |
Form 5 PDF |
| 2025-26 |
SUBMITTED |
08-10-2026 |
Form 5 PDF |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA11871/300523 |
29-04-2023 |
30-05-2023 |
— |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2023-24 |
164283 |
17-09-2024 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2024-25 |
164283 |
17-10-2025 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2025-26 |
164283 |
08-10-2026 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| LEGAL_PCWF |
LEGAL/0000255/28022024 |
28-02-2024 |
23-03-2024 |
— |
— |
— |
— |
— |
— |
Approved |
| LEGAL_PCWF |
LEGAL/0001262/13022025 |
13-02-2025 |
17-03-2025 |
— |
— |
— |
— |
— |
— |
Approved |
| BCR |
BCR/0003076/08012025R2 |
08-01-2025 |
13-01-2025 |
— |
— |
— |
— |
— |
— |
Approved |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
Available |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
23 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/18946 |
ok |
| applications |
project_reg/public/projectAllApplications/18946 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/18946 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/18946 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/18946 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/18946 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/18946 |
ok |
| core |
project_reg/public/alldatabyprojectid/18946 |
ok |
| form_eight |
quarter/getformpdf-by-id/18946 |
ok |
| form_four |
quarter/get-by-project-id/18946 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/270071 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/18946/16670 |
ok |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/18946 |
ok |
| form_three |
formthree/public/getform-three-byid/409763 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/18946 |
ok |
| form_two |
formtwo/public/getform-two-by-id/149603 |
ok |
| joint_development |
project_reg/public/land-owner/project18946 |
ok |
| location |
maplocation/public/getProjectLocations/18946 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/18946 |
ok |
| profile |
project_reg/public/getproject-details/18946 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/18946 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/18946 |
ok |
| promoter |
user_reg/promoter/promoter18026 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/18946 |
ok |
| qpr_progress |
quarter/get-project-progress/18946 |
ok |
| quarters |
quarter/public/getprojectqtrs/18946 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/GUJRERA/230510/014595 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.
MARUTI 360
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12039/280623
Project ID: 18991
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Residential/Group Housing
Promoter: ANJNEY FINEBUILD (PARTNERSHIP FIRM)
Registered On: 28-06-2023
Declared Completion: 30-04-2029
Construction Progress (as published): 2% (ill)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:11
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
MARUTI 360 |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12039/280623 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/GUJRERA/230522/014649 |
| Project Address |
MARUTI 360, OPP WIDE ANGLE BODAKDEV |
| Moje / Village |
— |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
Gujarat |
| Pin Code |
— |
| Project Type |
Residential/Group Housing |
| About Property |
Residential Project having 124 luxurious spacious and tallest units |
| Project Start Date |
11-04-2023 |
| Project End Date |
30-04-2029 |
| Project Land Area (sq m) |
8736 |
| Total Open Area (sq m) |
5513.13 |
| Total Covered Area (sq m) |
3222.87 |
| Total Carpet Area (sq m) |
40007.72 |
| Carpet Area Range (sq m) |
260.09 – 652.5999999999999 |
| Total Units |
124 |
| Plan Passing Authority |
AUDA |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS — · Block — · TP — (—) · FP — |
| Project Status |
New |
| Project Cost (₹) |
₹ 4,47,56,12,610 (declared on portal) |
| Unit Price Range (₹) |
₹ 2,87,50,000 – ₹ 12,99,00,000 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Residential |
A |
62 |
43 |
19 |
17225.92 |
| Residential |
B |
62 |
39 |
23 |
22781.8 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| A |
43 |
19 |
69.35 |
| B |
39 |
23 |
62.9 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
ANJNEY FINEBUILD |
| Promoter Type |
PARTNERSHIP FIRM |
| PAN |
ABQFA7083A |
| Registration No. |
GUJAH102398 |
| Office Address |
1101 11TH FLOOR, ELANZA VERTEX NR ZAINOBIYA, SINDHU BHAVAN ROAD Ahmedabad City Ahmedabad Gujarat 380059 |
| E-mail |
accounts2@marutibuildcon.com |
| Mobile |
9727738900 |
| Partners / Associates |
8 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
25 |
| Total Complied Quarters |
14 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
3 |
| Total Complied Annual Compliance |
3 |
| Total Annual Compliance Defaulted |
0 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
HDFC |
| Branch |
TRP MALL BOPAL |
| Account Name |
ANJNEY FINEBUILD MASTER COLLECTION ESCROW ACCOUNT |
| Account Number |
57500001343365 |
| IFSC |
HDFC0005041 |
| District / Taluka |
Ahmedabad / — |
| Pincode |
— |
1.6 Construction Booking Status
| Block |
Block Progress (%) |
Form-B Report (%) |
Un-booked Units |
Development Period |
| A |
0 |
0 |
19 |
13-02-2019 → 30-06-2023 |
| B+C |
20.62 |
0 |
— |
13-02-2019 → 30-06-2023 |
| D+E |
37.5 |
0 |
— |
13-02-2019 → 30-06-2023 |
| F |
0 |
0 |
— |
13-02-2019 → 30-06-2023 |
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12039/280623 |
06-05-2023 |
28-06-2023 |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2023-24 |
140219 |
29-10-2024 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2024-25 |
140219 |
30-10-2025 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2025-26 |
140219 |
30-10-2026 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| LEGAL_PCWF |
LEGAL/0000849/08082024 |
08-08-2024 |
29-08-2024 |
— |
— |
Approved |
— |
— |
— |
| BCR |
BCR/0002068/07102023 |
07-10-2023 |
08-11-2023 |
— |
— |
Approved |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| A |
90,00,00,000 |
68,00,00,000 |
76 |
22,00,00,000 |
30-09-2026 |
| B |
1,20,00,00,000 |
1,02,00,00,000 |
85 |
18,00,00,000 |
30-09-2026 |
| Form 2-B — common infrastructure |
55,00,00,000 |
0 |
0 |
55,00,00,000 |
30-09-2026 |
| Total |
2,65,00,00,000 |
1,70,00,00,000 |
64.15 |
95,00,00,000 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
MARUTI 360, OPP WIDE ANGLE BODAKDEV |
| Moje |
— |
| Revenue Survey No. |
— |
| City Survey No. |
— |
| Block No. |
— |
| TP / Scheme |
— / — |
| Final Plot No. |
— |
| Approving Authority |
AUDA |
| Land Area for Project (sq m) |
8736 |
| Total Land Area of Layout (sq m) |
8736 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
523 / 8927.75 |
| Parking for Sale (nos) |
0 |
| Open Parking Area (sq m) |
0 |
| Map Coordinates |
23.02353770154559, 72.50521077728376; 23.02357966698544, 72.50592156267271; 23.02393760697094, 72.50603421545134; 23.024046223054473, 72.50526173925505; 23.023525358766683, 72.50519736623869 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Not published |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
— |
| Swimming Pool Capacity |
— |
| Water Supply Flag |
— |
| Sewage Disposal Flag |
— |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| RESIDENTIAL LUXURIOS HOUSING UNIT |
124 |
— |
40007.72 |
4537.6 |
436.2 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| APURVA AMIN ARCHITECTS |
CA 2004 33949 |
rera@apurvaamin.com |
25 |
25 |
AAA, Near 31 Ivy Appartments Off Sindhu Bhavan Marg, Bodakdev |
CONFIRMED |
Structural Engineer(s)
| Name |
Licence No. |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| Nikunj Dhwarkadas Shah |
AMC – 001SE17102100442 |
nikunjshah.strc@gmail.com |
100 |
100 |
105-T, Shrinand Nagar -2 Makraba Road, Vejalpur |
CONFIRMED |
Chartered Accountant(s)
— (no records)
Contractor(s)
| Contractort Name |
Address |
Noofkeyprojectscompleted |
| PSP Projects Ltd. |
PSP House, Opp. Celesta Courtyard Iscon-Ambli Road |
200 |
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| A |
11-04-2023 |
31-12-2028 |
— |
— |
— |
— |
— |
— |
| B |
11-04-2023 |
31-12-2028 |
— |
— |
— |
— |
— |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
340388 |
| Form Status |
UPLOADED |
| Architect |
APURVA AMIN |
| COA Registration No. |
CA/2004/33949 |
| Valid Till |
31-12-2026 |
| Physical Site Visit Date |
09-10-2026 |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
11-04-2023 |
| Project End |
30-04-2029 |
| Remark |
Work Done is Physicaly verifed and check on the site of the Project |
| Submitted On |
09-10-2026 |
Form 1-A — Work Completed per Block
| Block |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| A |
100 |
100 / 3 |
100 / 1 |
100 |
100 / 35 |
70 |
95 |
4 |
65 |
0 |
| B |
100 |
100 / 3 |
0 / 1 |
100 |
100 / 35 |
70 |
95 |
4 |
65 |
0 |
Form 1-A — Construction Schedule: Block A
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
11-04-2023 |
31-10-2024 |
— |
— |
| Plinth |
11-04-2023 |
31-12-2027 |
— |
— |
| Podium |
04-11-2023 |
30-06-2025 |
— |
— |
| Stilt |
04-11-2023 |
30-06-2025 |
— |
— |
| Slab / RCC |
04-11-2023 |
30-06-2027 |
— |
— |
| Internal Finishing |
01-01-2025 |
31-03-2028 |
— |
— |
| Sanitary Fittings |
11-04-2023 |
31-08-2028 |
— |
— |
| Staircase |
11-04-2023 |
31-08-2028 |
— |
— |
| External Development |
01-01-2026 |
31-03-2028 |
— |
— |
| Installation |
11-04-2023 |
31-08-2028 |
— |
— |
| Common Area |
— |
— |
— |
— |
Form 1-A — Construction Schedule: Block B
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
11-04-2023 |
31-10-2024 |
— |
— |
| Plinth |
11-04-2023 |
31-12-2027 |
— |
— |
| Podium |
— |
— |
— |
— |
| Stilt |
04-11-2023 |
30-06-2025 |
— |
— |
| Slab / RCC |
04-11-2023 |
30-06-2027 |
— |
— |
| Internal Finishing |
01-01-2025 |
31-03-2028 |
— |
— |
| Sanitary Fittings |
11-04-2023 |
31-08-2028 |
— |
— |
| Staircase |
11-04-2023 |
31-08-2028 |
— |
— |
| External Development |
01-01-2026 |
31-08-2028 |
— |
— |
| Installation |
11-04-2023 |
31-08-2028 |
— |
— |
| Common Area |
— |
— |
— |
— |
2 site progress photographs attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
254278 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
Remarks |
| Internal Road |
YES |
11-04-2023 |
31-08-2028 |
10 |
NOT STARTED |
| Water Supply |
YES |
11-04-2023 |
31-08-2028 |
30 |
NOT STARTED |
| Sewerage |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Storm Water Drains |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Landscaping |
YES |
11-04-2023 |
31-08-2028 |
5 |
NOT STARTED |
| Street Lighting |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Community Buildings |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Treatment And Disposal |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Solid Waste Management |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Water Conservation |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Energy Management |
NO |
— |
— |
0 |
— |
| Fire Protection |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Electrical Meter Room |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Fire Fighting |
YES |
11-04-2023 |
31-08-2028 |
25 |
NOT STARTED |
| Drinking Water Facilities |
NO |
— |
— |
0 |
— |
| Emergency Evacuation |
NO |
— |
— |
0 |
— |
| Use Of Renewable Energy |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Security |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
| Letter Box |
YES |
11-04-2023 |
31-08-2028 |
0 |
NOT STARTED |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| A |
A-301 |
Residential |
263.38 |
27.83 |
UNBOOKED |
3,73,75,000 |
0 |
3,73,75,000 |
Created |
| A |
A-302 |
Residential |
263.1 |
27.83 |
UNBOOKED |
3,73,75,000 |
0 |
3,73,75,000 |
Created |
| A |
A-401 |
Residential |
263.38 |
27.83 |
UNBOOKED |
3,73,75,000 |
0 |
3,73,75,000 |
Created |
| A |
A-402 |
Residential |
263.1 |
27.83 |
UNBOOKED |
3,73,75,000 |
0 |
3,73,75,000 |
Created |
| A |
A-501 |
Residential |
263.38 |
27.83 |
UNBOOKED |
3,73,75,000 |
0 |
3,73,75,000 |
Created |
| A |
A-502 |
Residential |
263.1 |
27.83 |
UNBOOKED |
3,73,75,000 |
0 |
3,73,75,000 |
Created |
| A |
A-601 |
Residential |
263.38 |
27.83 |
BOOKED |
3,73,75,000 |
2,13,47,000 |
1,60,28,000 |
Released |
| A |
A-602 |
Residential |
263.1 |
27.83 |
UNBOOKED |
3,73,75,000 |
0 |
3,73,75,000 |
Created |
| A |
A-701 |
Residential |
260.09 |
27.83 |
BOOKED |
3,88,12,500 |
74,66,975 |
3,13,45,525 |
Released |
| A |
A-702 |
Residential |
263.1 |
27.83 |
BOOKED |
3,88,12,500 |
90,31,975 |
2,97,80,525 |
Released |
| A |
A-801 |
Residential |
263.38 |
27.83 |
BOOKED |
3,73,75,000 |
27,72,000 |
3,46,03,000 |
Released |
| A |
A-802 |
Residential |
263.1 |
27.83 |
BOOKED |
4,00,02,750 |
3,48,27,751 |
51,74,999 |
Released |
| A |
A-901 |
Residential |
263.38 |
27.83 |
BOOKED |
3,45,00,000 |
1,86,59,300 |
1,58,40,700 |
Released |
| A |
A-902 |
Residential |
263.1 |
27.83 |
BOOKED |
4,60,00,000 |
2,88,37,406 |
1,71,62,594 |
Released |
| A |
A-1001 |
Residential |
263.38 |
27.83 |
BOOKED |
4,02,50,000 |
1,13,80,000 |
2,88,70,000 |
Released |
| A |
A-1002 |
Residential |
263.1 |
27.83 |
UNBOOKED |
3,73,75,000 |
0 |
3,73,75,000 |
Created |
| A |
A-1101 |
Residential |
260.09 |
27.83 |
BOOKED |
3,39,25,000 |
2,87,50,000 |
51,75,000 |
Released |
| A |
A-1102 |
Residential |
263.1 |
27.83 |
BOOKED |
3,45,00,000 |
2,93,25,000 |
51,75,000 |
Released |
| A |
A-1201 |
Residential |
263.38 |
27.83 |
BOOKED |
4,88,75,000 |
3,86,36,500 |
1,02,38,500 |
Released |
| A |
A-1202 |
Residential |
263.1 |
27.83 |
BOOKED |
3,45,00,000 |
2,93,25,000 |
51,75,000 |
Released |
| A |
A-1401 |
Residential |
263.38 |
27.83 |
BOOKED |
2,87,50,000 |
1,34,13,809 |
1,53,36,191 |
Released |
| A |
A-1402 |
Residential |
263.1 |
27.83 |
UNBOOKED |
3,73,75,000 |
0 |
3,73,75,000 |
Created |
| A |
A-1501 |
Residential |
263.38 |
27.83 |
BOOKED |
3,73,75,000 |
2,03,00,000 |
1,70,75,000 |
Released |
| A |
A-1502 |
Residential |
263.1 |
27.83 |
BOOKED |
4,02,50,000 |
2,35,34,510 |
1,67,15,490 |
Released |
| A |
A-1601 |
Residential |
260.09 |
27.83 |
BOOKED |
4,60,00,000 |
2,94,90,000 |
1,65,10,000 |
Released |
Showing first 25 of 124 units — full list in raw/form_three.json.
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
ANJNEY FINEBUILD |
| Promoter Type |
PARTNERSHIP FIRM |
| PAN |
ABQFA7083A |
| Company / Firm Registration No. |
GUJAH102398 |
| Date of Incorporation |
28-11-2019 |
| Status |
REGISTERED |
| Registered Address |
1101 11TH FLOOR, ELANZA VERTEX NR ZAINOBIYA, SINDHU BHAVAN ROAD |
| Taluka / District / State |
Ahmedabad City / Ahmedabad / Gujarat |
| Pin Code |
380059 |
| E-mail |
accounts2@marutibuildcon.com |
| Mobile |
9727738900 |
| Telephone |
— |
| Website |
https://marutibuildcon.com |
| Registered On |
07-03-2024 |
3.2 Developer Group / Track Record
| Field |
Value |
| Developer Group |
MARUTI GROUP |
| Promoter Enterprise |
Partnership Firm |
| Total Projects |
50 |
| Projects Completed |
50 |
| Ongoing Projects |
3 |
| Total Area Constructed |
150000000 |
| Experience in Gujarat |
25 |
| Experience in Other States |
0 |
| Group History |
25 |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| MAYANK RATILAL PATEL |
ALWPP5126H |
9825024508 |
mayankpatel@marutibuildcon.com |
B-10,Rajhansh Society Nr. Nabard Vihar Xavier's Collage Road |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380006 |
| AMIT LAXMANBHAI PATEL |
ABJPP9877A |
9825007225 |
amitpatel@marutibuildcon.com |
8- MARUTI HILLS BUNGLOWS, NR. AARYA BUNGLOWS PRAHLADNAGAR ROAD, SATELLITE |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
| ARJUN ALKESHKUMAR PATEL |
BCFPP3146J |
9825077225 |
arjunpatel@marutibuildcon.com |
7- MARUTI HILLS BUNGLOWS, NR. AARYA BUNGLOWS PRAHLADNAGAR ROAD SATELLITE |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
| SIDDHARTH ALKESH PATEL |
CFKPP4769Q |
9825257225 |
sidpatel1199@gmail.com |
7- MARUTI HILLS BUNGLOWS, NR. AARYA BUNGLOWS PRAHLADNAGAR ROAD SATELLITE |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
| JIGAR JAYANTIBHAI PATEL |
ABXPP3698R |
9825033044 |
jigar@kamnathgroup.com |
7, Tapas Bunglows, , Opp. Rivera 11,Prahladnagar |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
| BHAVIN JAYANTIBHAI PATEL |
ADQPP3481R |
9825606766 |
bhavin@kamnathgroup.com |
7, Tapas Bunglows Opp. Rivera 11,Prahladnagar |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
| JIGNESH ARVINDBHAI SHAH |
AIQPS5239M |
9825012000 |
jigneshshah@marutibuildcon.com |
A-18, Gala Aurum, , Mamadpura Village Road, Makarba |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380051 |
| EXCELLIFE REALTY HEIGHTS LLP |
AAJFE6992L |
9978910730 |
rajiv@excellife.in |
1001, Shapath I, Opp. Rajpath Club, Bodakdev, S.G. Highway |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380054 |
8 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| MAYANK RATILAL PATEL |
ALWPP5126H |
9825024508 |
mayankpatel@marutibuildcon.com |
B-10, RAJHANS SOCIETY, BEHIND NAVARANGPURA TELE EXCHANGE, NAVRANGPURA |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380006 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| MARUTI 360 |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12039/280623 |
Residential/Group Housing |
New |
ANJNEY FINEBUILD |
11-04-2023 |
30-04-2029 |
Ahmedabad |
Ahmedabad City |
| NOT APPLICABLE |
— |
— |
— |
— |
— |
— |
Ahmedabad |
— |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Opening Balance (₹) |
Closing Balance (₹) |
| HDFC |
TRP MALL BOPAL |
ANJNEY FINEBUILD RERA RETENTION ACCOUNT FOR MARUTI 360 |
57500001343750 |
HDFC0005041 |
Ahmedabad / — |
0 |
0 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
81 |
| Time Lapsed (%) |
57.8 |
| RERA Assessment |
ill |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| November 2023 |
8.5 |
| January 2024 |
12.22 |
| April 2024 |
17.27 |
| July 2024 |
33.26 |
| October 2024 |
33.57 |
| October 2025 |
32.22 |
| January 2026 |
38.33 |
| April 2026 |
44.57 |
| July 2026 |
56.43 |
| October 2026 |
62.49 |
4.3 Block-wise Construction Progress
| Block |
Development Start |
Development End |
Block Progress (%) |
Form-B Report (%) |
Form-B Period |
| A |
13-02-2019 |
30-06-2023 |
0 |
0 |
13-02-2019 → 30-06-2023 |
| B+C |
13-02-2019 |
30-06-2023 |
20.62 |
0 |
13-02-2019 → 30-06-2023 |
| D+E |
13-02-2019 |
30-06-2023 |
37.5 |
0 |
13-02-2019 → 30-06-2023 |
| F |
13-02-2019 |
30-06-2023 |
0 |
0 |
13-02-2019 → 30-06-2023 |
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
Jun-23 – Oct-23 |
07-10-2023 |
07-10-2023 |
03-10-2023 |
SUBMITTED |
— |
— |
— |
— |
| Q-2 |
Oct-23 – Dec-23 |
31-12-2023 |
21-02-2024 |
13-02-2024 |
SUBMITTED |
YES |
— |
— |
— |
| Q-3 |
Jan-24 – Mar-24 |
31-03-2024 |
22-04-2024 |
11-04-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-4 |
Apr-24 – Jun-24 |
30-06-2024 |
07-07-2024 |
04-07-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-5 |
Jul-24 – Sep-24 |
30-09-2024 |
07-10-2024 |
04-10-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-6 |
Oct-24 – Dec-24 |
31-12-2024 |
10-01-2025 |
04-01-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-7 |
Jan-25 – Mar-25 |
31-03-2025 |
07-04-2025 |
05-04-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-8 |
Apr-25 – Jun-25 |
30-06-2025 |
07-07-2025 |
05-07-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-9 |
Jul-25 – Sep-25 |
30-09-2025 |
07-10-2025 |
04-10-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-10 |
Oct-25 – Dec-25 |
31-12-2025 |
07-01-2026 |
06-01-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-11 |
Jan-26 – Mar-26 |
31-03-2026 |
07-04-2026 |
06-04-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-12 |
Apr-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
06-07-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-13 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
07-10-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-14 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
ACTIVE |
— |
— |
— |
— |
| Q-15 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-16 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-17 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-18 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-19 |
Jan-28 – Mar-28 |
31-03-2028 |
07-04-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-20 |
Apr-28 – Jun-28 |
30-06-2028 |
07-07-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-21 |
Jul-28 – Sep-28 |
30-09-2028 |
07-10-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| X-1 |
Oct-28 – Dec-28 |
31-12-2028 |
07-01-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| X-2 |
Jan-29 – Mar-29 |
31-03-2029 |
07-04-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Apr-29 – Apr-29 |
30-04-2029 |
30-04-2029 |
— |
ACTIVE |
— |
— |
— |
— |
| BWA-1 |
Oct-26 – Oct-36 |
09-10-2036 |
09-10-2036 |
10-10-2026 |
SUBMITTED |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2023-24 |
SUBMITTED |
29-10-2024 |
Form 5 PDF |
| 2024-25 |
SUBMITTED |
30-10-2025 |
Form 5 PDF |
| 2025-26 |
SUBMITTED |
30-10-2026 |
Form 5 PDF |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12039/280623 |
06-05-2023 |
28-06-2023 |
— |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2023-24 |
140219 |
29-10-2024 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2024-25 |
140219 |
30-10-2025 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2025-26 |
140219 |
30-10-2026 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| LEGAL_PCWF |
LEGAL/0000849/08082024 |
08-08-2024 |
29-08-2024 |
— |
— |
— |
— |
— |
— |
Approved |
| BCR |
BCR/0002068/07102023 |
07-10-2023 |
08-11-2023 |
— |
— |
— |
— |
— |
— |
Approved |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
— |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
40 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/18991 |
ok |
| applications |
project_reg/public/projectAllApplications/18991 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/18991 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/18991 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/18991 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/18991 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/18991 |
ok |
| core |
project_reg/public/alldatabyprojectid/18991 |
ok |
| form_eight |
quarter/getformpdf-by-id/18991 |
ok |
| form_four |
quarter/get-by-project-id/18991 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/340388 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/18991/16715 |
ok |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/18991 |
ok |
| form_three |
formthree/public/getform-three-byid/458760 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/18991 |
ok |
| form_two |
formtwo/public/getform-two-by-id/174149 |
ok |
| joint_development |
project_reg/public/land-owner/project18991 |
ok |
| location |
maplocation/public/getProjectLocations/18991 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/18991 |
ok |
| profile |
project_reg/public/getproject-details/18991 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/18991 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/18991 |
ok |
| promoter |
user_reg/promoter/promoter18071 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/18991 |
ok |
| qpr_progress |
quarter/get-project-progress/18991 |
ok |
| quarters |
quarter/public/getprojectqtrs/18991 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/GUJRERA/230522/014649 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.
The Sovereign
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12448/131023
Project ID: 19577
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Residential/Group Housing
Promoter: ASHIMA LIMITED (COMPANY)
Registered On: 13-10-2023
Declared Completion: 31-12-2029
Construction Progress (as published): 2% (Slow)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:16
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
The Sovereign |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12448/131023 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/GUJRERA/230904/015347 |
| Project Address |
The Sovereign, Near Thaltej-Shilaj Bridge, Thaltej |
| Moje / Village |
— |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
Gujarat |
| Pin Code |
— |
| Project Type |
Residential/Group Housing |
| About Property |
Tall Building Residential Housing Project |
| Project Start Date |
01-09-2023 |
| Project End Date |
31-12-2029 |
| Project Land Area (sq m) |
5653 |
| Total Open Area (sq m) |
4109.57 |
| Total Covered Area (sq m) |
1347.43 |
| Total Carpet Area (sq m) |
26845.09 |
| Carpet Area Range (sq m) |
259.04 – 398.16 |
| Total Units |
102 |
| Plan Passing Authority |
AUDA |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS — · Block — · TP — (—) · FP — |
| Project Status |
New |
| Project Cost (₹) |
₹ 3,97,23,42,746 (declared on portal) |
| Unit Price Range (₹) |
₹ 3,79,78,410 – ₹ 9,18,72,000 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Residential |
The Sovereign |
102 |
12 |
90 |
26845.09 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| The Sovereign |
12 |
90 |
11.76 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
ASHIMA LIMITED |
| Promoter Type |
COMPANY |
| PAN |
AACCA2750L |
| Registration No. |
L99999GJ1982PLC005253 |
| Office Address |
Texcellence Complex Near Anupam Cinema, Khokhara, Ahmedabad City Ahmedabad Gujarat 380021 |
| E-mail |
finance.re@ashima.in |
| Mobile |
9164833000 |
| Partners / Associates |
2 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
27 |
| Total Complied Quarters |
11 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
3 |
| Total Complied Annual Compliance |
3 |
| Total Annual Compliance Defaulted |
0 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
ICICI Bank |
| Branch |
Ashram Road |
| Account Name |
Ashima Limited - The Sovereign RERA Collection Account |
| Account Number |
018905013664 |
| IFSC |
ICIC0000189 |
| District / Taluka |
Ahmedabad / — |
| Pincode |
— |
1.6 Construction Booking Status
| Block |
Block Progress (%) |
Form-B Report (%) |
Un-booked Units |
Development Period |
| CITY ONE WORLD WING C |
46.5 |
0 |
— |
03-01-2019 → 30-03-2022 |
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12448/131023 |
24-08-2023 |
13-10-2023 |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2023-24 |
191982 |
30-09-2024 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2024-25 |
191982 |
30-10-2025 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2025-26 |
191982 |
30-10-2026 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| TP_PCWF |
TP/0000227/15032025 |
19-04-2025 |
19-04-2025 |
— |
— |
Approved |
— |
— |
— |
| LEGAL_PCWF |
LEGAL/0000820/26092024 |
26-09-2024 |
12-10-2024 |
— |
— |
Approved |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| The Sovereign |
2,49,50,67,525 |
21,81,25,480 |
9 |
2,27,69,42,045 |
15-09-2024 |
| Form 2-B — common infrastructure |
17,50,00,000 |
1,67,96,379 |
10 |
15,82,03,621 |
15-09-2024 |
| Total |
2,67,00,67,525 |
23,49,21,859 |
8.8 |
2,43,51,45,666 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
The Sovereign, Near Thaltej-Shilaj Bridge, Thaltej |
| Moje |
— |
| Revenue Survey No. |
— |
| City Survey No. |
— |
| Block No. |
— |
| TP / Scheme |
— / — |
| Final Plot No. |
— |
| Approving Authority |
AUDA |
| Land Area for Project (sq m) |
5457 |
| Total Land Area of Layout (sq m) |
5653 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
721 / 10993 |
| Parking for Sale (nos) |
0 |
| Open Parking Area (sq m) |
0 |
| Map Coordinates |
23.051588562176917, 72.49116542785833; 23.05147009611906, 72.49185475557516; 23.050813594825836, 72.49154898374746; 23.05095921005059, 72.49089452474783 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Not published |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
— |
| Swimming Pool Capacity |
— |
| Water Supply Flag |
— |
| Sewage Disposal Flag |
— |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| The Sovereign |
102 |
— |
26845.09 |
1750.01 |
0 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| Jinesh Dhruv |
CA/2019/109557 |
contact@99studio.in |
1000 |
1000 |
11th Floor Landmark Above State Bank of India Nr. Titanium City Center, 100 Feet Anand Nagar Rd, Satellite, |
CONFIRMED |
Structural Engineer(s)
| Name |
Licence No. |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| JAYESH D PANDYA |
001SE19052610117 |
jayesh@duconconsultants.in |
75 |
75 |
8/ A, Sarvoday Society, Maninagar |
CONFIRMED |
Chartered Accountant(s)
— (no records)
Contractor(s)
— (no records)
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| The Sovereign |
01-09-2023 |
31-08-2029 |
— |
— |
— |
— |
— |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
281768 |
| Form Status |
UPLOADED |
| Architect |
JINESH NAVINCHANDRA DHRUV |
| COA Registration No. |
— |
| Valid Till |
— |
| Physical Site Visit Date |
— |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
01-09-2023 |
| Project End |
31-08-2029 |
| Remark |
— |
| Submitted On |
— |
Form 1-A — Work Completed per Block
| Block |
Progress (%) |
Floors |
Lifts |
Units Booked |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| The Sovereign |
16.62 |
37 |
5 |
12 |
93 |
51 / 3 |
0 |
0 |
29.73 / 40 |
2.7 |
29.73 |
0 |
0 |
0 |
Form 1-A — Construction Schedule: Block The Sovereign
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
01-09-2023 |
30-09-2024 |
01-09-2023 |
25-10-2024 |
| Plinth |
13-12-2024 |
28-02-2028 |
26-10-2024 |
28-02-2028 |
| Podium |
— |
— |
— |
— |
| Stilt |
25-08-2024 |
31-12-2024 |
— |
— |
| Slab / RCC |
13-12-2024 |
28-02-2028 |
— |
— |
| Internal Finishing |
23-10-2025 |
30-11-2028 |
23-10-2025 |
30-11-2028 |
| Sanitary Fittings |
16-01-2027 |
30-11-2028 |
— |
— |
| Staircase |
16-01-2027 |
28-02-2028 |
— |
— |
| External Development |
15-06-2027 |
30-06-2029 |
15-06-2027 |
30-06-2029 |
| Installation |
31-03-2028 |
30-06-2029 |
— |
— |
| Common Area |
15-06-2027 |
30-06-2029 |
15-06-2027 |
30-06-2029 |
1 site progress photograph attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
209672 |
| Form-B Period |
23-10-2025 → 30-06-2029 |
| Form-B Reported Progress (%) |
1.5 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
| Internal Road |
YES |
01-02-2029 |
30-06-2029 |
29 |
| Water Supply |
YES |
01-02-2029 |
30-06-2029 |
0 |
| Sewerage |
YES |
01-02-2029 |
30-06-2029 |
0 |
| Storm Water Drains |
YES |
01-02-2029 |
30-06-2029 |
0 |
| Landscaping |
YES |
17-05-2029 |
30-06-2029 |
9 |
| Street Lighting |
YES |
17-05-2029 |
30-06-2029 |
0 |
| Community Buildings |
YES |
21-07-2028 |
30-06-2029 |
0 |
| Treatment And Disposal |
YES |
08-11-2028 |
30-06-2029 |
0 |
| Solid Waste Management |
YES |
17-05-2029 |
30-06-2029 |
0 |
| Water Conservation |
YES |
18-03-2029 |
30-06-2029 |
0 |
| Energy Management |
YES |
01-02-2029 |
30-06-2029 |
0 |
| Fire Protection |
YES |
01-02-2029 |
30-06-2029 |
0 |
| Electrical Meter Room |
YES |
01-02-2029 |
30-06-2029 |
0 |
| Fire Fighting |
YES |
01-06-2028 |
30-06-2029 |
0 |
| Drinking Water Facilities |
YES |
07-04-2029 |
30-06-2029 |
0 |
| Emergency Evacuation |
YES |
12-05-2029 |
30-06-2029 |
0 |
| Use Of Renewable Energy |
YES |
23-10-2025 |
30-06-2029 |
0 |
| Security |
YES |
12-05-2029 |
30-06-2029 |
0 |
| Letter Box |
YES |
21-06-2029 |
30-06-2029 |
0 |
| Compound Wall |
YES |
— |
— |
0 |
| Plinth Protection |
YES |
— |
— |
0 |
| Water Tank |
YES |
— |
— |
24 |
| Other Requirement |
YES |
— |
— |
0 |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| The Sovereign |
A-2 |
Residential |
260.38 |
26.51 |
UNBOOKED |
4,70,77,500 |
0 |
4,70,77,500 |
Created |
| The Sovereign |
B-2 |
Residential |
260.49 |
26.51 |
UNBOOKED |
4,70,92,500 |
0 |
4,70,92,500 |
Created |
| The Sovereign |
C-2 |
Residential |
260.38 |
26.51 |
UNBOOKED |
4,70,77,500 |
0 |
4,70,77,500 |
Created |
| The Sovereign |
A-3 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
B-3 |
Residential |
259.04 |
14.83 |
UNBOOKED |
4,50,97,500 |
0 |
4,50,97,500 |
Created |
| The Sovereign |
C-3 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
A-4 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
B-4 |
Residential |
259.04 |
14.83 |
UNBOOKED |
4,50,97,500 |
0 |
4,50,97,500 |
Created |
| The Sovereign |
C-4 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
A-5 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
B-5 |
Residential |
259.04 |
14.83 |
UNBOOKED |
4,50,97,500 |
0 |
4,50,97,500 |
Created |
| The Sovereign |
C-5 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
A-6 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
B-6 |
Residential |
259.04 |
14.83 |
UNBOOKED |
4,50,97,500 |
0 |
4,50,97,500 |
Created |
| The Sovereign |
C-6 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
A-7 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
B-7 |
Residential |
259.04 |
14.83 |
UNBOOKED |
4,50,97,500 |
0 |
4,50,97,500 |
Created |
| The Sovereign |
C-7 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
A-8 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
B-8 |
Residential |
259.04 |
14.83 |
BOOKED |
4,11,95,900 |
1,71,39,602 |
2,40,56,298 |
Created |
| The Sovereign |
C-8 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
A-9 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
B-9 |
Residential |
259.04 |
14.83 |
UNBOOKED |
4,50,97,500 |
0 |
4,50,97,500 |
Created |
| The Sovereign |
C-9 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
| The Sovereign |
A-10 |
Residential |
259.07 |
14.83 |
UNBOOKED |
4,51,05,000 |
0 |
4,51,05,000 |
Created |
Showing first 25 of 102 units — full list in raw/form_three.json.
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
ASHIMA LIMITED |
| Promoter Type |
COMPANY |
| PAN |
AACCA2750L |
| Company / Firm Registration No. |
L99999GJ1982PLC005253 |
| Date of Incorporation |
17-06-1982 |
| Status |
ENQUIRY |
| Registered Address |
Texcellence Complex Near Anupam Cinema, Khokhara, |
| Taluka / District / State |
Ahmedabad City / Ahmedabad / Gujarat |
| Pin Code |
380021 |
| E-mail |
finance.re@ashima.in |
| Mobile |
9164833000 |
| Telephone |
— |
| Website |
— |
| Registered On |
— |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| CHINTAN NAVNITLAL PARIKH |
AAUPP1376Q |
9164833000 |
finance.re@ashima.in |
Chitrakut, B/H Cargo Ford Motors, Off. C. G. Road Ellisbridge, Ahmedabad |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380006 |
| KRISHNACHINTAN CHINTAN PARIKH |
APZPP0945H |
9164833000 |
finance.re@ashima.in |
Chitrakut, B/H Cargo Ford Motors, Off. C. G. Road Ellisbridge, Ahmedabad |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380006 |
2 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| Jayesh Champaklal Bhayani |
AARPB6365N |
9164833000 |
finance.re@ashima.in |
A-201, Pushpavan Apartmnet, Judges Bungalows Road, Bodakdev |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380054 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| The Sovereign |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12448/131023 |
Residential/Group Housing |
New |
ASHIMA LIMITED |
01-09-2023 |
31-12-2029 |
Ahmedabad |
Ahmedabad City |
| Swan Lake |
— |
— |
— |
— |
— |
— |
Mehsana |
— |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Opening Balance (₹) |
Closing Balance (₹) |
| ICICI Bank |
Ashram Road |
Ashima Limited Real Estate Division The Sovereign Retention Account |
018905013665 |
ICIC0000189 |
Ahmedabad / — |
0 |
14,70,000 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
9 |
| Time Lapsed (%) |
17.16 |
| RERA Assessment |
Slow |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| January 2024 |
10.05 |
| April 2024 |
10.43 |
| July 2024 |
12.99 |
| October 2024 |
14.36 |
| October 2025 |
17.63 |
| January 2026 |
26.51 |
| April 2026 |
32.77 |
| October 2026 |
50.41 |
4.3 Block-wise Construction Progress
| Block |
Development Start |
Development End |
Block Progress (%) |
Form-B Report (%) |
Form-B Period |
| CITY ONE WORLD WING C |
03-01-2019 |
30-03-2022 |
46.5 |
0 |
03-01-2019 → 30-03-2022 |
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
Oct-23 – Dec-23 |
31-12-2023 |
07-03-2024 |
22-02-2024 |
SUBMITTED |
YES |
— |
— |
— |
| Q-2 |
Jan-24 – Mar-24 |
31-03-2024 |
22-04-2024 |
04-04-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-3 |
Apr-24 – Jun-24 |
30-06-2024 |
07-07-2024 |
04-07-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-4 |
Jul-24 – Sep-24 |
30-09-2024 |
07-10-2024 |
05-10-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-5 |
Oct-24 – Dec-24 |
31-12-2024 |
10-01-2025 |
07-01-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-6 |
Jan-25 – Mar-25 |
31-03-2025 |
07-04-2025 |
— |
EXEMPT |
— |
— |
— |
— |
| Q-7 |
Apr-25 – Jun-25 |
30-06-2025 |
07-07-2025 |
30-09-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-8 |
Jul-25 – Sep-25 |
30-09-2025 |
07-10-2025 |
07-10-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-9 |
Oct-25 – Dec-25 |
31-12-2025 |
07-01-2026 |
07-01-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-10 |
Jan-26 – Mar-26 |
31-03-2026 |
07-04-2026 |
06-04-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-11 |
Apr-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
07-07-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-12 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
07-10-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-13 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
ACTIVE |
— |
— |
— |
— |
| Q-14 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-15 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-16 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-17 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-18 |
Jan-28 – Mar-28 |
31-03-2028 |
07-04-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-19 |
Apr-28 – Jun-28 |
30-06-2028 |
07-07-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-20 |
Jul-28 – Sep-28 |
30-09-2028 |
07-10-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-21 |
Oct-28 – Dec-28 |
31-12-2028 |
07-01-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-22 |
Jan-29 – Mar-29 |
31-03-2029 |
07-04-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-23 |
Apr-29 – Jun-29 |
30-06-2029 |
07-07-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| X-1 |
Jul-29 – Sep-29 |
30-09-2029 |
07-10-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| BWA-1 |
Jan-25 – Mar-25 |
30-03-2025 |
30-03-2025 |
— |
INACTIVE |
— |
— |
— |
— |
| BWA-2 |
Apr-25 – Jun-25 |
29-06-2025 |
29-06-2025 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Oct-29 – Dec-29 |
31-12-2029 |
31-12-2029 |
— |
ACTIVE |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2023-24 |
SUBMITTED |
30-09-2024 |
Form 5 PDF |
| 2024-25 |
SUBMITTED |
30-10-2025 |
Form 5 PDF |
| 2025-26 |
SUBMITTED |
30-10-2026 |
Form 5 PDF |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12448/131023 |
24-08-2023 |
13-10-2023 |
— |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2023-24 |
191982 |
30-09-2024 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2024-25 |
191982 |
30-10-2025 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2025-26 |
191982 |
30-10-2026 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| TP_PCWF |
TP/0000227/15032025 |
19-04-2025 |
19-04-2025 |
— |
— |
— |
— |
— |
— |
Approved |
| LEGAL_PCWF |
LEGAL/0000820/26092024 |
26-09-2024 |
12-10-2024 |
— |
— |
— |
— |
— |
— |
Approved |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
Available |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
22 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/19577 |
ok |
| applications |
project_reg/public/projectAllApplications/19577 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/19577 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/19577 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/19577 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/19577 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/19577 |
ok |
| core |
project_reg/public/alldatabyprojectid/19577 |
ok |
| form_eight |
quarter/getformpdf-by-id/19577 |
ok |
| form_four |
quarter/get-by-project-id/19577 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/281768 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/19577/17301 |
ok |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/19577 |
ok |
| form_three |
formthree/public/getform-three-byid/417701 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/19577 |
ok |
| form_two |
formtwo/public/getform-two-by-id/151232 |
ok |
| joint_development |
project_reg/public/land-owner/project19577 |
ok |
| location |
maplocation/public/getProjectLocations/19577 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/19577 |
ok |
| profile |
project_reg/public/getproject-details/19577 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/19577 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/19577 |
ok |
| promoter |
user_reg/promoter/promoter18657 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/19577 |
ok |
| qpr_progress |
quarter/get-project-progress/19577 |
ok |
| quarters |
quarter/public/getprojectqtrs/19577 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/GUJRERA/230904/015347 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.
WESTLANDS
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A2R/210726/300927
Project ID: 19599
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Residential/Group Housing
Promoter: GOOD VALUE PROPERTIES INDIA LLP (LIMITED LIABILITY PARTNERSHIP FIRM)
Registered On: 10-11-2023
Declared Completion: 30-01-2028
Construction Progress (as published): 2% (ill)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:12
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
WESTLANDS |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A2R/210726/300927 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/GUJRERA/230929/015388 |
| Project Address |
Westlands, Near Sukrut Repose, Ambli |
| Moje / Village |
Ambli |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
Gujarat |
| Pin Code |
— |
| Project Type |
Residential/Group Housing |
| About Property |
Residential Flats |
| Project Start Date |
29-08-2023 |
| Project End Date |
30-01-2028 |
| Project Land Area (sq m) |
5467 |
| Total Open Area (sq m) |
2748.74 |
| Total Covered Area (sq m) |
2718.26 |
| Total Carpet Area (sq m) |
18439.44 |
| Carpet Area Range (sq m) |
244.56 – 660.81 |
| Total Units |
59 |
| Plan Passing Authority |
Ahmedabad Municipal Corporation |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS 495/A · Block — · TP 52 (Ambli) · FP 140 |
| Project Status |
New |
| Project Cost (₹) |
₹ 85,00,00,000 (Form 2-A + 2-B estimates) |
| Unit Price Range (₹) |
₹ 2,69,77,500 – ₹ 9,72,66,250 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Residential |
A+B+C+D |
59 |
48 |
11 |
18439.44 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| A+B+C+D |
48 |
11 |
81.36 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
GOOD VALUE PROPERTIES INDIA LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AAYFG1996R |
| Registration No. |
ABB1633 |
| Office Address |
D-611, WESTGATE,NR YMCA CLUB, SG HIGHWAY, MAKARBA Ahmedabad City Ahmedabad GUJARAT 380051 |
| E-mail |
info@goodvaluellp.com |
| Mobile |
9825251081 |
| Partners / Associates |
2 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
20 |
| Total Complied Quarters |
12 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
3 |
| Total Complied Annual Compliance |
3 |
| Total Annual Compliance Defaulted |
0 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
STATE BANK OF INDIA |
| Branch |
SPECIALIZED COMMERCIAL BRANCH |
| Account Name |
GOOD VALUE PROPERTIES INDIA LLP |
| Account Number |
00000042808012280 |
| IFSC |
SBIN0017901 |
| District / Taluka |
Ahmedabad / Ahmedabad City |
| Pincode |
380015 |
1.6 Construction Booking Status
| Block |
Block Progress (%) |
Form-B Report (%) |
Un-booked Units |
Development Period |
| A |
78 |
0 |
— |
23-02-2017 → 23-01-2021 |
| B |
66.25 |
0 |
— |
23-02-2017 → 23-01-2021 |
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A2R/210726/300927 |
29-08-2023 |
10-11-2023 |
— |
— |
— |
— |
— |
— |
| Alteration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A1R/220725/300927 |
27-06-2025 |
22-07-2025 |
— |
— |
— |
— |
— |
— |
| Alteration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A2R/210726/300927 |
05-05-2026 |
21-07-2026 |
— |
— |
— |
— |
— |
— |
| Complaint |
SMC/SELL/ONLINE/Ahmedabad/13112025/00581 |
13-11-2025 |
— |
— |
— |
— |
CMP1311202501396 |
— |
— |
| Annual Compliance |
2023-24 |
129674 |
29-10-2024 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2024-25 |
154709 |
09-12-2025 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2025-26 |
154709 |
31-10-2026 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| TP_PCWF |
TP/0000292/09062025 |
22-06-2025 |
22-06-2025 |
— |
— |
Approved |
— |
— |
— |
| LEGAL_PCWF |
LEGAL/0000890/08082024 |
08-08-2024 |
29-08-2024 |
— |
— |
Approved |
— |
— |
— |
| BCR |
BCR/0002766/14072024R2 |
— |
08-08-2024 |
— |
— |
Approved |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| A+B+C+D |
82,00,00,000 |
61,01,83,340 |
74 |
20,98,16,660 |
31-03-2026 |
| Form 2-B — common infrastructure |
3,00,00,000 |
80,00,000 |
27 |
2,20,00,000 |
31-03-2026 |
| Total |
85,00,00,000 |
61,81,83,340 |
72.73 |
23,18,16,660 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
Westlands, Near Sukrut Repose, Ambli |
| Moje |
Ambli |
| Revenue Survey No. |
495/A |
| City Survey No. |
— |
| Block No. |
— |
| TP / Scheme |
52 / Ambli |
| Final Plot No. |
140 |
| Approving Authority |
Ahmedabad Municipal Corporation |
| Land Area for Project (sq m) |
5467 |
| Total Land Area of Layout (sq m) |
5467 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
531 / 10622.87 |
| Parking for Sale (nos) |
0 |
| Open Parking Area (sq m) |
0 |
| Map Coordinates |
23.02541956297215, 72.48620581125304; 23.02532881996061, 72.48544055453976; 23.02468763582889, 72.48553990172567; 23.02479737681224, 72.48624587614034; 23.02541956297215, 72.48620581125304 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Not published |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
local authority |
| Swimming Pool Capacity |
— |
| Water Supply Flag |
Yes |
| Sewage Disposal Flag |
Yes |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| Flat |
59 |
48 |
18439.44 |
1590.2 |
346.62 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
| RUPESH M. BHATT |
CA/1997/21080 |
9426180200 |
rupesh_bhatt@rediffmail.com |
40 |
19 |
201 |
Structural Engineer(s)
| Name |
Licence No. |
PAN |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| GAURAV BABULAL PRAJAPATI |
001ERL05102701217 |
BBLPP1695K |
9909922441 |
gpcool33@gmail.com |
30 |
11 |
5, KRISHNA ROW HOUSE |
ACTIVE |
Chartered Accountant(s)
— (no records)
Contractor(s)
— (no records)
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| A+B+C+D |
29-08-2023 |
30-09-2027 |
30 |
20641.75 |
37504.13 |
07724/170223/A6971/R2/M1 |
18-03-2026 |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
316374 |
| Form Status |
UPLOADED |
| Architect |
CALEB GLEN FERRO |
| COA Registration No. |
CA/2015/69608 |
| Valid Till |
31-12-2026 |
| Physical Site Visit Date |
25-04-2026 |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
29-08-2023 |
| Project End |
30-09-2027 |
| Remark |
Actual site visit date is 31/03/2026. |
| Submitted On |
25-04-2026 |
Form 1-A — Work Completed per Block
| Block |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| A+B+C+D |
100 |
100 / 2 |
0 |
100 |
100 / 11 |
90 |
100 |
50 |
90 |
70 |
Form 1-A — Construction Schedule: Block A+B+C+D
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
29-08-2023 |
31-12-2023 |
— |
— |
| Plinth |
01-01-2024 |
31-05-2024 |
— |
— |
| Podium |
— |
— |
— |
— |
| Stilt |
01-06-2024 |
30-06-2024 |
— |
— |
| Slab / RCC |
01-07-2024 |
31-07-2025 |
— |
— |
| Internal Finishing |
01-08-2025 |
31-12-2026 |
— |
— |
| Sanitary Fittings |
01-09-2025 |
31-03-2027 |
— |
— |
| Staircase |
01-08-2024 |
30-09-2025 |
— |
— |
| External Development |
01-06-2025 |
31-01-2027 |
— |
— |
| Installation |
01-09-2025 |
30-04-2027 |
— |
— |
| Common Area |
— |
— |
— |
— |
1 site progress photograph attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
235723 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
Remarks |
| Internal Road |
YES |
01-01-2026 |
30-06-2027 |
20 |
— |
| Water Supply |
YES |
01-12-2025 |
31-05-2027 |
40 |
— |
| Sewerage |
YES |
01-12-2025 |
31-05-2027 |
30 |
— |
| Storm Water Drains |
YES |
01-12-2025 |
31-05-2027 |
40 |
— |
| Landscaping |
YES |
01-06-2027 |
30-06-2027 |
0 |
— |
| Street Lighting |
YES |
01-05-2027 |
30-06-2027 |
0 |
— |
| Community Buildings |
YES |
01-12-2025 |
30-06-2027 |
40 |
Society Common Amenities |
| Treatment And Disposal |
YES |
01-12-2025 |
31-03-2027 |
30 |
— |
| Solid Waste Management |
YES |
01-05-2027 |
31-05-2027 |
0 |
— |
| Water Conservation |
YES |
01-12-2025 |
31-03-2027 |
30 |
— |
| Energy Management |
YES |
01-01-2026 |
28-02-2027 |
20 |
Space for D.G Set |
| Fire Protection |
YES |
01-12-2025 |
28-02-2027 |
40 |
— |
| Electrical Meter Room |
YES |
01-12-2025 |
28-02-2027 |
30 |
— |
| Fire Fighting |
YES |
01-12-2025 |
28-02-2027 |
40 |
— |
| Drinking Water Facilities |
YES |
01-12-2025 |
31-03-2026 |
40 |
— |
| Emergency Evacuation |
YES |
01-02-2026 |
28-02-2027 |
10 |
Fire Lift |
| Use Of Renewable Energy |
YES |
31-10-2026 |
28-02-2027 |
0 |
Solar |
| Security |
YES |
01-05-2027 |
31-05-2027 |
0 |
— |
| Letter Box |
YES |
01-05-2027 |
31-05-2027 |
0 |
— |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| A+B+C+D |
A1-1 |
Residential |
268.46 |
23.34 |
UNBOOKED |
3,40,00,000 |
0 |
3,40,00,000 |
Created |
| A+B+C+D |
A1-2 |
Residential |
268.46 |
23.34 |
BOOKED |
3,31,24,000 |
1,42,50,000 |
1,88,74,000 |
Created |
| A+B+C+D |
A1-3 |
Residential |
268.66 |
23.34 |
BOOKED |
3,53,20,000 |
3,53,20,000 |
0 |
Created |
| A+B+C+D |
A1-4 |
Residential |
268.66 |
23.34 |
BOOKED |
3,10,18,000 |
2,31,00,000 |
79,18,000 |
Created |
| A+B+C+D |
A1-5 |
Residential |
268.33 |
23.34 |
BOOKED |
3,46,00,000 |
2,92,37,750 |
53,62,250 |
Created |
| A+B+C+D |
A1-6 |
Residential |
268.37 |
23.34 |
BOOKED |
3,53,20,000 |
35,32,000 |
3,17,88,000 |
Created |
| A+B+C+D |
A1-7 |
Residential |
268.37 |
23.34 |
BOOKED |
3,46,00,000 |
2,92,37,750 |
53,62,250 |
Created |
| A+B+C+D |
A1-8 |
Residential |
474.24 |
80.79 |
UNBOOKED |
6,50,00,000 |
0 |
6,50,00,000 |
Created |
| A+B+C+D |
A2-1 |
Residential |
249.23 |
18.66 |
UNBOOKED |
3,15,00,000 |
0 |
3,15,00,000 |
Created |
| A+B+C+D |
A2-2 |
Residential |
249.23 |
18.66 |
UNBOOKED |
3,15,00,000 |
0 |
3,15,00,000 |
Created |
| A+B+C+D |
A2-3 |
Residential |
249.23 |
18.66 |
UNBOOKED |
3,15,00,000 |
0 |
3,15,00,000 |
Created |
| A+B+C+D |
A2-4 |
Residential |
252.03 |
15.78 |
BOOKED |
3,54,25,000 |
85,00,000 |
2,69,25,000 |
Created |
| A+B+C+D |
A2-6 |
Residential |
249.23 |
18.66 |
BOOKED |
2,69,77,500 |
2,69,77,500 |
0 |
Created |
| A+B+C+D |
A2-7 |
Residential |
249.23 |
18.66 |
BOOKED |
2,69,77,500 |
2,69,77,500 |
0 |
Created |
| A+B+C+D |
A2-9 |
Residential |
660.81 |
98.88 |
BOOKED |
9,72,66,250 |
97,00,000 |
8,75,66,250 |
Created |
| A+B+C+D |
B1-1 |
Residential |
264.45 |
13.08 |
BOOKED |
2,82,75,000 |
10,00,000 |
2,72,75,000 |
Created |
| A+B+C+D |
B1-2 |
Residential |
264.45 |
13.08 |
BOOKED |
2,82,75,000 |
10,00,000 |
2,72,75,000 |
Created |
| A+B+C+D |
B1-3 |
Residential |
264.41 |
13.08 |
BOOKED |
3,09,06,075 |
3,09,06,075 |
0 |
Created |
| A+B+C+D |
B1-4 |
Residential |
260.49 |
16.99 |
BOOKED |
3,67,57,500 |
36,50,000 |
3,31,07,500 |
Created |
| A+B+C+D |
B1-5 |
Residential |
514.28 |
30.68 |
BOOKED |
6,29,76,455 |
59,37,500 |
5,70,38,955 |
Created |
| A+B+C+D |
B1-6 |
Residential |
264.41 |
13.08 |
UNBOOKED |
3,25,00,000 |
0 |
3,25,00,000 |
Created |
| A+B+C+D |
B1-7 |
Residential |
264.68 |
12.43 |
BOOKED |
3,53,50,250 |
2,64,00,000 |
89,50,250 |
Created |
| A+B+C+D |
B1-8 |
Residential |
264.82 |
13.08 |
UNBOOKED |
3,25,00,000 |
0 |
3,25,00,000 |
Created |
| A+B+C+D |
B2-1 |
Residential |
292.76 |
30.21 |
BOOKED |
3,51,00,000 |
3,00,00,000 |
51,00,000 |
Created |
| A+B+C+D |
B2-2 |
Residential |
292.76 |
30.21 |
BOOKED |
3,25,00,000 |
1,16,10,000 |
2,08,90,000 |
Created |
Showing first 25 of 59 units — full list in raw/form_three.json.
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
GOOD VALUE PROPERTIES INDIA LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AAYFG1996R |
| Company / Firm Registration No. |
ABB1633 |
| Date of Incorporation |
27-05-2022 |
| Status |
REGISTERED |
| Registered Address |
D-611, WESTGATE,NR YMCA CLUB, SG HIGHWAY, MAKARBA |
| Taluka / District / State |
Ahmedabad City / Ahmedabad / GUJARAT |
| Pin Code |
380051 |
| E-mail |
info@goodvaluellp.com |
| Mobile |
9825251081 |
| Telephone |
— |
| Website |
— |
| Registered On |
24-08-2023 |
3.2 Developer Group / Track Record
| Field |
Value |
| Developer Group |
GOOD VALUE PROPERTIES INDIA LLP |
| Promoter Enterprise |
LIMITED LIABILITY PARTNERSHIP FIRM |
| Total Projects |
0 |
| Projects Completed |
0 |
| Ongoing Projects |
0 |
| Total Area Constructed |
0.00 |
| Experience in Gujarat |
0 |
| Experience in Other States |
0 |
| Group History |
— |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| MITESH SUMANBHAI SHAH |
ACNPS4447C |
9825073479 |
goodvaluellp@gmail.com |
1, TRUE VALUE HOMES, MUMMATPURA ROAD, OPP YMCA CLUB |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380054 |
| HITARTH BHADRESH TURAKHIA |
AFKPT2752B |
9687403536 |
hitarth@turakhiagroup.com |
19, MANICHANDRA SOCIETY PART-5, OPP, SARTHI-3, SURDHARA CIRCLE, MEMNAGAR |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380052 |
2 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| MITESH SUMANBHAI SHAH |
ACNPS4447C |
9825073479 |
goodvaluellp@gmail.com |
1, TRUE VALUE HOMES, MUMMATPURA ROAD, OPP YMCA CLUB |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380054 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| WESTLANDS |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A2R/210726/300927 |
Residential/Group Housing |
New |
GOOD VALUE PROPERTIES INDIA LLP |
29-08-2023 |
30-01-2028 |
Ahmedabad |
Ahmedabad City |
| No Project in last 5 Years |
— |
— |
— |
— |
— |
— |
Ahmedabad |
— |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Pincode |
Opening Balance (₹) |
Closing Balance (₹) |
| STATE BANK OF INDIA |
SPECIALIZED COMMERCIAL BRANCH |
GOOD VALUE PROPERTIES INDIA LLP RERA RETENTION AC WESTLANDS |
42808011571 |
SBIN0017901 |
Ahmedabad / Ahmedabad City |
380015 |
15,93,900 |
1,15,34,600 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
75 |
| Time Lapsed (%) |
60.43 |
| RERA Assessment |
ill |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| April 2024 |
11.48 |
| July 2024 |
17.85 |
| October 2024 |
22.95 |
| October 2025 |
38.91 |
| January 2026 |
51.5 |
| April 2026 |
72.85 |
| July 2026 |
86.66 |
| October 2026 |
94.35 |
4.3 Block-wise Construction Progress
| Block |
Development Start |
Development End |
Block Progress (%) |
Form-B Report (%) |
Form-B Period |
| A |
23-02-2017 |
23-01-2021 |
78 |
0 |
23-02-2017 → 23-01-2021 |
| B |
23-02-2017 |
23-01-2021 |
66.25 |
0 |
23-02-2017 → 23-01-2021 |
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
Nov-23 – Mar-24 |
31-03-2024 |
22-04-2024 |
20-04-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-2 |
Apr-24 – Jun-24 |
30-06-2024 |
07-07-2024 |
05-07-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-3 |
Jul-24 – Sep-24 |
30-09-2024 |
22-10-2024 |
10-10-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-4 |
Oct-24 – Dec-24 |
31-12-2024 |
10-01-2025 |
06-01-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-5 |
Jan-25 – Mar-25 |
31-03-2025 |
07-04-2025 |
07-04-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-6 |
Apr-25 – Jun-25 |
30-06-2025 |
07-07-2025 |
— |
EXEMPT |
— |
— |
— |
— |
| Q-7 |
Jul-25 – Sep-25 |
30-09-2025 |
07-10-2025 |
04-10-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-8 |
Oct-25 – Dec-25 |
31-12-2025 |
07-01-2026 |
06-01-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-9 |
Jan-26 – Mar-26 |
31-03-2026 |
07-04-2026 |
04-04-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-10 |
Apr-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
06-07-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-11 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
01-10-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-12 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
ACTIVE |
— |
— |
— |
— |
| Q-13 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-14 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| X-1 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| BWA-1 |
Jul-25 – Sep-25 |
29-09-2025 |
29-09-2025 |
04-09-2025 |
SUBMITTED |
— |
— |
— |
— |
| BWA-2 |
Feb-26 – Feb-36 |
12-02-2036 |
12-02-2036 |
24-04-2026 |
SUBMITTED |
— |
— |
— |
— |
| X-2 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Jan-28 – Jan-28 |
30-01-2028 |
30-01-2028 |
— |
ACTIVE |
— |
— |
— |
— |
| BWA-3 |
Sep-26 – Sep-36 |
23-09-2036 |
23-09-2036 |
— |
ACTIVE |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2023-24 |
SUBMITTED |
29-10-2024 |
Form 5 PDF |
| 2024-25 |
SUBMITTED |
09-12-2025 |
Form 5 PDF |
| 2025-26 |
SUBMITTED |
31-10-2026 |
Form 5 PDF |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A2R/210726/300927 |
29-08-2023 |
10-11-2023 |
— |
— |
— |
— |
— |
— |
— |
| Alteration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A1R/220725/300927 |
27-06-2025 |
22-07-2025 |
— |
— |
— |
— |
— |
— |
— |
| Alteration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA12618/A2R/210726/300927 |
05-05-2026 |
21-07-2026 |
— |
— |
— |
— |
— |
— |
— |
| Complaint |
SMC/SELL/ONLINE/Ahmedabad/13112025/00581 |
13-11-2025 |
— |
CMP1311202501396 |
HEARING_SCHEDULE |
— |
— |
— |
— |
— |
| Annual Compliance |
2023-24 |
129674 |
29-10-2024 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2024-25 |
154709 |
09-12-2025 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2025-26 |
154709 |
31-10-2026 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| TP_PCWF |
TP/0000292/09062025 |
22-06-2025 |
22-06-2025 |
— |
— |
— |
— |
— |
— |
Approved |
| LEGAL_PCWF |
LEGAL/0000890/08082024 |
08-08-2024 |
29-08-2024 |
— |
— |
— |
— |
— |
— |
Approved |
| BCR |
BCR/0002766/14072024R2 |
— |
08-08-2024 |
— |
— |
— |
— |
— |
— |
Approved |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
Available |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
29 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/19599 |
ok |
| applications |
project_reg/public/projectAllApplications/19599 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/19599 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/19599 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/19599 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/19599 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/19599 |
ok |
| core |
project_reg/public/alldatabyprojectid/19599 |
ok |
| form_eight |
quarter/getformpdf-by-id/19599 |
ok |
| form_four |
quarter/get-by-project-id/19599 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/316374 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/19599/17323 |
ok |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/19599 |
ok |
| form_three |
formthree/public/getform-three-byid/450203 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/19599 |
ok |
| form_two |
formtwo/public/getform-two-by-id/170001 |
ok |
| joint_development |
project_reg/public/land-owner/project19599 |
ok |
| location |
maplocation/public/getProjectLocations/19599 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/19599 |
ok |
| profile |
project_reg/public/getproject-details/19599 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/19599 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/19599 |
ok |
| promoter |
user_reg/promoter/promoter15810 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/19599 |
ok |
| qpr_progress |
quarter/get-project-progress/19599 |
ok |
| quarters |
quarter/public/getprojectqtrs/19599 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/GUJRERA/230929/015388 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.
SHYASWA SAROVAR
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA13078/050324/311229
Project ID: 20957
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Residential/Group Housing
Promoter: BEQUEST INFRAPROJECTS LLP (LIMITED LIABILITY PARTNERSHIP FIRM)
Registered On: 05-03-2024
Declared Completion: 30-04-2030
Construction Progress (as published): 2% (ill)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:22
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
SHYASWA SAROVAR |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA13078/050324/311229 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/240201/020957 |
| Project Address |
N/R. Shilaj circle, Nr. Shalin Solitude Moje Shilaj Ahmedabad |
| Moje / Village |
Shilaj |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
GUJARAT |
| Pin Code |
380058 |
| Project Type |
Residential/Group Housing |
| About Property |
Residential project of 80 Flats. |
| Project Start Date |
01-01-2024 |
| Project End Date |
30-04-2030 |
| Project Land Area (sq m) |
3933 |
| Total Open Area (sq m) |
2219.96 |
| Total Covered Area (sq m) |
1713.04 |
| Total Carpet Area (sq m) |
20921.48 |
| Carpet Area Range (sq m) |
251.65 – 449.01 |
| Total Units |
80 |
| Plan Passing Authority |
Ahmedabad Municipal Corporation |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS 425 , 434 , 436 · Block — · TP 53/A (Shilaj - Thaltej - Hebatpur) · FP 36 + 45 + 47 |
| Project Status |
New |
| Project Cost (₹) |
₹ 99,00,00,000 (Form 2-A + 2-B estimates) |
| Unit Price Range (₹) |
₹ 1,75,00,000 – ₹ 8,55,19,250 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Residential |
A |
80 |
43 |
37 |
20921.48 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| A |
43 |
37 |
53.75 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
BEQUEST INFRAPROJECTS LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AAZFB1860G |
| Registration No. |
ABA6925 |
| Office Address |
3rd floor,KIFS Tower, Ambali-Bopal road Ahmedabad Daskroi Ahmedabad GUJARAT 380058 |
| E-mail |
bequestinfraprojectsllp@gmail.com |
| Mobile |
9090147000 |
| Partners / Associates |
6 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
27 |
| Total Complied Quarters |
11 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
4 |
| Total Complied Annual Compliance |
2 |
| Total Annual Compliance Defaulted |
2 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
HDFC BANK |
| Branch |
SOUTH BOPAL |
| Account Name |
BEQUEST INFRAPROJECTS LLP SHYASWA SAROVAR MAS COLL ESCROW ACCT |
| Account Number |
57500001396638 |
| IFSC |
HDFC0004115 |
| District / Taluka |
Ahmedabad / Ahmedabad City |
| Pincode |
380015 |
1.6 Construction Booking Status
— (no construction progress records published)
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA13078/050324/311229 |
01-02-2024 |
05-03-2024 |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2023-24 |
190249 |
26-10-2024 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2024-25 |
191746 |
08-12-2025 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2025-26 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2029-30 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| A |
92,00,00,000 |
31,45,17,856 |
34 |
60,54,82,144 |
30-09-2026 |
| Form 2-B — common infrastructure |
7,00,00,000 |
0 |
0 |
7,00,00,000 |
30-09-2026 |
| Total |
99,00,00,000 |
31,45,17,856 |
31.77 |
67,54,82,144 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
N/R. Shilaj circle, Nr. Shalin Solitude Moje Shilaj Ahmedabad |
| Moje |
Shilaj |
| Revenue Survey No. |
425 , 434 , 436 |
| City Survey No. |
— |
| Block No. |
— |
| TP / Scheme |
53/A / Shilaj - Thaltej - Hebatpur |
| Final Plot No. |
36 + 45 + 47 |
| Approving Authority |
Ahmedabad Municipal Corporation |
| Land Area for Project (sq m) |
3933 |
| Total Land Area of Layout (sq m) |
3933 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
456 / 6599.79 |
| Parking for Sale (nos) |
0 |
| Open Parking Area (sq m) |
0 |
| Map Coordinates |
23.055000445251366, 72.47853076232018; 23.054810410715668, 72.47922277224602; 23.054339025189904, 72.47904708755554; 23.054519188439112, 72.47837787640633 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Not published |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
Local Authority |
| Swimming Pool Capacity |
73917.36 |
| Water Supply Flag |
Yes |
| Sewage Disposal Flag |
Yes |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| Flat |
80 |
0 |
20921.48 |
2376.76 |
533.48 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
Mobile |
E-mail |
Key Projects Completed |
Address |
| Vidhi Satishbhai Gajjar |
CA/2018/103740 |
9429021118 |
design@adsapl.in |
12 |
274 |
Structural Engineer(s)
| Name |
Licence No. |
PAN |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| KETAV PADMAKANT JOSHI |
001SE22072600042 |
ABPPJ6590E |
9824049202 |
contact@shreejistructurals.com |
400 |
22 |
503,ABHIJYOT SQUARE.S.G.HIGH WAY, |
ACTIVE |
Chartered Accountant(s)
— (no records)
Contractor(s)
— (no records)
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| A |
01-01-2024 |
31-12-2029 |
69.9 |
25990.59 |
40955.58 |
05263/230323/A7187/R1/M1 |
01-01-2024 |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
341904 |
| Form Status |
UPLOADED |
| Architect |
VIDHI SATISHBHAI GAJJAR |
| COA Registration No. |
CA/2018/103740 |
| Valid Till |
31-12-2026 |
| Physical Site Visit Date |
23-10-2026 |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
01-01-2024 |
| Project End |
30-04-2030 |
| Remark |
— |
| Submitted On |
23-10-2026 |
Form 1-A — Work Completed per Block
| Block |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| A |
100 |
70 / 3 |
0 |
0 |
0 / 26 |
0 |
0 |
0 |
0 |
0 |
Form 1-A — Construction Schedule: Block A
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
15-02-2024 |
31-03-2025 |
— |
— |
| Plinth |
01-06-2024 |
30-06-2026 |
— |
— |
| Podium |
— |
— |
— |
— |
| Stilt |
01-06-2024 |
31-12-2025 |
— |
— |
| Slab / RCC |
28-03-2024 |
30-11-2025 |
— |
— |
| Internal Finishing |
30-11-2024 |
31-12-2028 |
— |
— |
| Sanitary Fittings |
31-12-2025 |
30-06-2029 |
— |
— |
| Staircase |
31-12-2025 |
30-06-2029 |
— |
— |
| External Development |
31-12-2025 |
30-06-2029 |
— |
— |
| Installation |
31-12-2027 |
30-06-2029 |
— |
— |
| Common Area |
— |
— |
— |
— |
1 site progress photograph attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
255096 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
Remarks |
| Internal Road |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Water Supply |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Sewerage |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Storm Water Drains |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Landscaping |
YES |
01-01-2029 |
30-06-2029 |
0 |
WIP |
| Street Lighting |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Community Buildings |
YES |
28-03-2024 |
31-12-2028 |
0 |
WIP |
| Treatment And Disposal |
NO |
— |
— |
0 |
— |
| Solid Waste Management |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Water Conservation |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Energy Management |
NO |
— |
— |
0 |
— |
| Fire Protection |
YES |
30-06-2028 |
30-06-2029 |
0 |
WIP |
| Electrical Meter Room |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Fire Fighting |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Drinking Water Facilities |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Emergency Evacuation |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Use Of Renewable Energy |
YES |
31-12-2027 |
30-06-2029 |
0 |
WIP |
| Security |
YES |
01-01-2029 |
30-06-2029 |
0 |
WIP |
| Letter Box |
YES |
01-01-2029 |
30-06-2029 |
0 |
WIP |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| A |
201 |
Residential |
251.66 |
85.55 |
UNBOOKED |
2,21,02,500 |
0 |
2,21,02,500 |
Created |
| A |
202 |
Residential |
251.66 |
81.51 |
BOOKED |
4,50,00,000 |
3,37,50,000 |
1,12,50,000 |
Released |
| A |
203 |
Residential |
251.66 |
102.09 |
UNBOOKED |
2,22,25,000 |
0 |
2,22,25,000 |
Created |
| A |
204 |
Residential |
251.66 |
102.49 |
BOOKED |
3,00,00,000 |
3,00,000 |
2,97,00,000 |
Created |
| A |
301 |
Residential |
251.65 |
29.07 |
BOOKED |
3,15,00,000 |
2,48,06,000 |
66,94,000 |
Released |
| A |
302 |
Residential |
251.65 |
29.07 |
BOOKED |
3,05,25,000 |
2,22,75,000 |
82,50,000 |
Released |
| A |
303 |
Residential |
251.65 |
29.07 |
BOOKED |
3,30,00,000 |
1,81,50,000 |
1,48,50,000 |
Released |
| A |
304 |
Residential |
251.65 |
29.07 |
BOOKED |
3,50,00,000 |
2,96,50,000 |
53,50,000 |
Released |
| A |
401 |
Residential |
251.65 |
29.07 |
BOOKED |
2,20,00,000 |
1,66,85,000 |
53,15,000 |
Released |
| A |
402 |
Residential |
251.65 |
29.07 |
BOOKED |
3,00,00,000 |
2,67,30,000 |
32,70,000 |
Released |
| A |
403 |
Residential |
251.65 |
29.07 |
BOOKED |
3,95,00,000 |
2,76,50,000 |
1,18,50,000 |
Released |
| A |
404 |
Residential |
251.65 |
29.07 |
UNBOOKED |
2,22,25,000 |
0 |
2,22,25,000 |
Created |
| A |
501 |
Residential |
251.65 |
29.07 |
BOOKED |
2,56,60,800 |
1,71,17,631 |
85,43,169 |
Released |
| A |
502 |
Residential |
251.65 |
29.07 |
BOOKED |
3,30,00,000 |
2,00,00,000 |
1,30,00,000 |
Released |
| A |
503 |
Residential |
251.65 |
29.07 |
UNBOOKED |
2,22,25,000 |
0 |
2,22,25,000 |
Created |
| A |
504 |
Residential |
251.65 |
29.07 |
BOOKED |
2,04,12,000 |
93,85,000 |
1,10,27,000 |
Created |
| A |
601 |
Residential |
251.65 |
29.07 |
BOOKED |
3,30,00,000 |
2,76,40,000 |
53,60,000 |
Released |
| A |
602 |
Residential |
251.65 |
29.07 |
UNBOOKED |
2,21,02,500 |
0 |
2,21,02,500 |
Created |
| A |
603 |
Residential |
251.65 |
29.07 |
UNBOOKED |
2,22,25,000 |
0 |
2,22,25,000 |
Created |
| A |
604 |
Residential |
251.65 |
29.07 |
BOOKED |
2,65,00,000 |
1,74,10,000 |
90,90,000 |
Released |
| A |
701 |
Residential |
251.65 |
29.07 |
BOOKED |
2,21,00,000 |
22,10,000 |
1,98,90,000 |
Created |
| A |
702 |
Residential |
251.65 |
29.07 |
UNBOOKED |
2,21,02,500 |
0 |
2,21,02,500 |
Created |
| A |
703 |
Residential |
251.65 |
29.07 |
BOOKED |
3,14,32,400 |
1,87,16,200 |
1,27,16,200 |
Released |
| A |
704 |
Residential |
251.65 |
29.07 |
UNBOOKED |
2,22,25,000 |
0 |
2,22,25,000 |
Created |
| A |
801 |
Residential |
251.65 |
29.07 |
UNBOOKED |
2,21,02,500 |
0 |
2,21,02,500 |
Created |
Showing first 25 of 80 units — full list in raw/form_three.json.
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
BEQUEST INFRAPROJECTS LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AAZFB1860G |
| Company / Firm Registration No. |
ABA6925 |
| Date of Incorporation |
17-02-2022 |
| Status |
REGISTERED |
| Registered Address |
3rd floor,KIFS Tower, Ambali-Bopal road Ahmedabad |
| Taluka / District / State |
Daskroi / Ahmedabad / GUJARAT |
| Pin Code |
380058 |
| E-mail |
bequestinfraprojectsllp@gmail.com |
| Mobile |
9090147000 |
| Telephone |
— |
| Website |
— |
| Registered On |
30-01-2024 |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| MITESH DINESHBHAI CHHAG |
AHQPC9822R |
7228817007 |
miteshchhag80@gmail.com |
Radha Krishna, Janta Society, B/H K V School, Una, Junagadh,Gujrat |
Una |
Gir Somnath |
GUJARAT |
362560 |
| BHAVESHBHAI BALKRISHNA PANDHI |
ACTPP5517C |
9428086151 |
bbpandhi1@gmail.com |
Raslila, Anandvatika Society, Una, Junagadh, Gujrat |
Una |
Gir Somnath |
GUJARAT |
362560 |
| MAYURDHVAJSINH KANTUBHA JADEJA |
AGVPJ1013B |
9099881011 |
mayur_jadeja@yahoo.com |
Aadarsh Society-1, Khodiyar Colony, Jamnagar, Gujrat |
Jamnagar |
Jamnagar |
GUJARAT |
361006 |
| KALPESH DHIRUBHAI THAKKAR |
AEIPT0973K |
9925034036 |
mananthakkar2275@gmail.com |
11, Sugam Elegance, Dudhiya Dairy Gali Fatehpura Paldi, Ahemdabad City, Gujrat |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380007 |
| BHAVESH NATVARLAL SHAH |
AFSPS6222F |
9825640555 |
bhavesh03shah@gmail.com |
12/A, Anita Society,Nr. Vishwakunj Char Rasta N N Road Paldi,Ahemdabad,Gujrat |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380007 |
| GAYTRIBEN RAMCHAND SUJANANI |
AEAPS0755G |
9979999977 |
gsujnani@gmail.com |
202,Ratnakar Caledonia, Balaji garden Restaurant Lane, Prernatirth Derasar Road, Ahmedabad, Gujrat |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
6 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| MITESH DINESHBHAI CHHAG |
AHQPC9822R |
7228817007 |
miteshchhag80@gmail.com |
Radha Krishna, Janta Society, B/H K V School, Una, Junagadh,Gujrat |
Una |
Gir Somnath |
GUJARAT |
362560 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| SHYASWA SAROVAR |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA13078/050324/311229 |
Residential/Group Housing |
New |
BEQUEST INFRAPROJECTS LLP |
01-01-2024 |
30-04-2030 |
Ahmedabad |
Ahmedabad City |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Pincode |
Opening Balance (₹) |
Closing Balance (₹) |
| HDFC BANK |
SOUTH BOPAL |
BEQUEST INFRAPROJECTS LLP SHYASWA SAROVAR RERA ESCROW ACCT |
57500001397170 |
HDFC0004115 |
Ahmedabad / Ahmedabad City |
380015 |
0 |
0 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
35 |
| Time Lapsed (%) |
44.44 |
| RERA Assessment |
ill |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| July 2024 |
4.46 |
| October 2024 |
4.46 |
| October 2025 |
17.39 |
| April 2026 |
29.38 |
| July 2026 |
50.21 |
| October 2026 |
64.93 |
4.3 Block-wise Construction Progress
— (no records)
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
Mar-24 – Jun-24 |
30-06-2024 |
07-07-2024 |
05-07-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-2 |
Jul-24 – Sep-24 |
30-09-2024 |
07-10-2024 |
28-08-2024 |
SUBMITTED |
— |
— |
— |
— |
| Q-3 |
Oct-24 – Dec-24 |
31-12-2024 |
10-01-2025 |
09-01-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-4 |
Jan-25 – Mar-25 |
31-03-2025 |
07-04-2025 |
02-04-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-5 |
Apr-25 – Jun-25 |
30-06-2025 |
07-07-2025 |
05-07-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-6 |
Jul-25 – Sep-25 |
30-09-2025 |
07-10-2025 |
05-10-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-7 |
Oct-25 – Dec-25 |
31-12-2025 |
07-01-2026 |
06-01-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-8 |
Jan-26 – Mar-26 |
31-03-2026 |
07-04-2026 |
05-04-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-9 |
Apr-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
02-09-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-10 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
08-10-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-11 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
ACTIVE |
— |
— |
— |
— |
| Q-12 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-13 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-14 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-15 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-16 |
Jan-28 – Mar-28 |
31-03-2028 |
07-04-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-17 |
Apr-28 – Jun-28 |
30-06-2028 |
07-07-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-18 |
Jul-28 – Sep-28 |
30-09-2028 |
07-10-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-19 |
Oct-28 – Dec-28 |
31-12-2028 |
07-01-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-20 |
Jan-29 – Mar-29 |
31-03-2029 |
07-04-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-21 |
Apr-29 – Jun-29 |
30-06-2029 |
07-07-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-22 |
Jul-29 – Sep-29 |
30-09-2029 |
07-10-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| X-1 |
Oct-29 – Dec-29 |
31-12-2029 |
07-01-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| BWA-1 |
Jan-25 – Mar-25 |
30-03-2025 |
30-03-2025 |
— |
INACTIVE |
— |
— |
— |
— |
| X-2 |
Jan-30 – Mar-30 |
31-03-2030 |
07-04-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Apr-30 – Apr-30 |
30-04-2030 |
30-04-2030 |
— |
ACTIVE |
— |
— |
— |
— |
| BWA-2 |
Oct-26 – Oct-36 |
22-10-2036 |
22-10-2036 |
26-10-2026 |
SUBMITTED |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2023-24 |
SUBMITTED |
26-10-2024 |
Form 5 PDF |
| 2024-25 |
SUBMITTED |
08-12-2025 |
Form 5 PDF |
| 2025-26 |
ACTIVE |
— |
— |
| 2026-27 |
ACTIVE |
— |
— |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA13078/050324/311229 |
01-02-2024 |
05-03-2024 |
— |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2023-24 |
190249 |
26-10-2024 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2024-25 |
191746 |
08-12-2025 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2025-26 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2029-30 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
— |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
39 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/20957 |
ok |
| applications |
project_reg/public/projectAllApplications/20957 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/20957 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/20957 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/20957 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/20957 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/20957 |
ok |
| core |
project_reg/public/alldatabyprojectid/20957 |
ok |
| form_eight |
quarter/getformpdf-by-id/20957 |
ok |
| form_four |
quarter/get-by-project-id/20957 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/341904 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/20957/17674 |
ok |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/20957 |
portal returned HTTP 5xx |
| form_three |
formthree/public/getform-three-byid/459323 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/20957 |
ok |
| form_two |
formtwo/public/getform-two-by-id/174506 |
ok |
| joint_development |
project_reg/public/land-owner/project20957 |
ok |
| location |
maplocation/public/getProjectLocations/20957 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/20957 |
ok |
| profile |
project_reg/public/getproject-details/20957 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/20957 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/20957 |
ok |
| promoter |
user_reg/promoter/promoter19303 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/20957 |
ok |
| qpr_progress |
quarter/get-project-progress/20957 |
ok |
| quarters |
quarter/public/getprojectqtrs/20957 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/240201/020957 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.
H7
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA14549/A1R/121125/120228
Project ID: 24465
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Mixed Development
Promoter: HRISHIKESH VENTURES LLP (LIMITED LIABILITY PARTNERSHIP FIRM)
Registered On: 20-12-2024
Declared Completion: 12-02-2028
Construction Progress (as published): 2% (ill)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:07
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
H7 |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA14549/A1R/121125/120228 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/240918/024465 |
| Project Address |
H7, OPPOSITE GLS UNIVERSITY LAW GARDEN, ELLISBRIDGE, NAVRANGPURA |
| Moje / Village |
CHANGISPUR |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
GUJARAT |
| Pin Code |
380006 |
| Project Type |
Mixed Development |
| About Property |
Commercial Plus Residential Hostel Building |
| Project Start Date |
14-08-2024 |
| Project End Date |
12-02-2028 |
| Project Land Area (sq m) |
1295.95 |
| Total Open Area (sq m) |
650.16 |
| Total Covered Area (sq m) |
645.79 |
| Total Carpet Area (sq m) |
2916.72 |
| Carpet Area Range (sq m) |
61.63 – 2660.42 |
| Total Units |
5 |
| Plan Passing Authority |
Ahmedabad Municipal Corporation |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS — · Block — · TP 3 (ELLISBRIDGE ( CHANGISPUR SECTION )) · FP 428/2 |
| Project Status |
New |
| Project Cost (₹) |
₹ 14,72,00,000 (Form 2-A + 2-B estimates) |
| Unit Price Range (₹) |
₹ 1,92,13,000 – ₹ 34,62,81,350 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Residential |
H7 |
1 |
1 |
0 |
2660.42 |
| Shop |
H7 |
4 |
4 |
0 |
256.3 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| H7 |
5 |
0 |
100 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
HRISHIKESH VENTURES LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AANFH7259P |
| Registration No. |
AAV8035 |
| Office Address |
501, HRISHIKESH BUILDING VASANT BAUG, OFF C G ROAD Ahmedabad City Ahmedabad Gujarat 380006 |
| E-mail |
hrishikeshenterprise@gmail.com |
| Mobile |
9099926343 |
| Partners / Associates |
3 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
16 |
| Total Complied Quarters |
7 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
3 |
| Total Complied Annual Compliance |
2 |
| Total Annual Compliance Defaulted |
1 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
ICICI BANK LIMITED |
| Branch |
HERITAGE CHAMBERS |
| Account Name |
M/S.HRISHIKESH VENTURES LLP H7 COLLECTION ESCROW ACCOUNT |
| Account Number |
403105000754 |
| IFSC |
ICIC0004031 |
| District / Taluka |
Ahmedabad / Ahmedabad City |
| Pincode |
380015 |
1.6 Construction Booking Status
| Block |
Block Progress (%) |
Form-B Report (%) |
Un-booked Units |
Development Period |
| 26 |
0 |
18.5 |
— |
28-07-2016 → 30-06-2025 |
| 67 |
0 |
18.5 |
— |
28-07-2016 → 30-06-2025 |
| 200 |
0 |
18.5 |
— |
28-07-2016 → 30-06-2025 |
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA14549/A1R/121125/120228 |
18-09-2024 |
20-12-2024 |
— |
— |
— |
— |
— |
— |
| Alteration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA14549/A1R/121125/120228 |
22-08-2025 |
12-11-2025 |
— |
— |
— |
— |
— |
— |
| Complaint |
SMC/SELL/ONLINE/Ahmedabad/29112025/00669 |
29-11-2025 |
— |
— |
— |
— |
CMP2911202501554 |
— |
— |
| Annual Compliance |
2024-25 |
109934 |
10-12-2025 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2025-26 |
109934 |
18-03-2026 |
— |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
ACTIVE |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| H7 |
14,00,00,000 |
12,20,94,000 |
87 |
1,79,06,000 |
31-07-2025 |
| Form 2-B — common infrastructure |
72,00,000 |
0 |
0 |
72,00,000 |
31-07-2025 |
| Total |
14,72,00,000 |
12,20,94,000 |
82.94 |
2,51,06,000 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
H7, OPPOSITE GLS UNIVERSITY LAW GARDEN, ELLISBRIDGE, NAVRANGPURA |
| Moje |
CHANGISPUR |
| Revenue Survey No. |
— |
| City Survey No. |
3778 |
| Block No. |
— |
| TP / Scheme |
3 / ELLISBRIDGE ( CHANGISPUR SECTION ) |
| Final Plot No. |
428/2 |
| Approving Authority |
Ahmedabad Municipal Corporation |
| Land Area for Project (sq m) |
1295.95 |
| Total Land Area of Layout (sq m) |
1295.95 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
248 / 805.44 |
| Parking for Sale (nos) |
0 |
| Open Parking Area (sq m) |
0 |
| Map Coordinates |
23.02777292839119, 72.55948834028473; 23.027486584625237, 72.55935959425202; 23.027368097371742, 72.55956344213715; 23.02767418923026, 72.55972437467804 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Not published |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
local authority |
| Swimming Pool Capacity |
— |
| Water Supply Flag |
Yes |
| Sewage Disposal Flag |
Yes |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| Shop |
4 |
4 |
256.3 |
0 |
0 |
| Residential |
1 |
1 |
2660.42 |
0 |
0 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
| AJIT KOSHY C.B. MATHEWS |
CA/1996/20389 |
9825005971 |
am@ajitmathews.com |
350 |
28 |
314 SAMAAN |
Structural Engineer(s)
| Name |
Licence No. |
PAN |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| JIGISH DINESHCHANDRA PARIKH |
1114SE03022900066 |
AERPP0024Q |
9824092191 |
jigish@jhanavic.com |
150 |
5 |
406, 4th FLOOR, ADDOR AMBITION, NAVRANG CIRCLE TO STADIUM ROAD |
ACTIVE |
Chartered Accountant(s)
— (no records)
Contractor(s)
— (no records)
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| H7 |
14-08-2024 |
12-02-2028 |
24.5 |
3495.62 |
5794.61 |
07026/020524/A8292/R1/M1 |
05-08-2025 |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
285466 |
| Form Status |
UPLOADED |
| Architect |
AJIT KOSHY C.B. MATHEWS |
| COA Registration No. |
CA/1996/20389 |
| Valid Till |
31-12-2030 |
| Physical Site Visit Date |
06-10-2025 |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
14-08-2024 |
| Project End |
12-02-2028 |
| Remark |
NONE |
| Submitted On |
06-10-2025 |
Form 1-A — Work Completed per Block
| Block |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| H7 |
100 |
100 / 1 |
0 |
100 |
100 / 8 |
100 |
100 |
100 |
100 |
100 |
Form 1-A — Construction Schedule: Block H7
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
14-09-2024 |
10-12-2024 |
— |
— |
| Plinth |
14-09-2024 |
10-12-2024 |
— |
— |
| Podium |
— |
— |
— |
— |
| Stilt |
30-10-2024 |
11-12-2024 |
— |
— |
| Slab / RCC |
11-12-2024 |
15-02-2025 |
— |
— |
| Internal Finishing |
28-12-2024 |
30-09-2025 |
— |
— |
| Sanitary Fittings |
01-10-2025 |
31-01-2026 |
— |
— |
| Staircase |
30-11-2024 |
31-01-2026 |
— |
— |
| External Development |
15-02-2025 |
31-01-2028 |
— |
— |
| Installation |
01-04-2025 |
31-01-2028 |
— |
— |
| Common Area |
— |
— |
— |
— |
1 site progress photograph attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
213114 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
Remarks |
| Internal Road |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Water Supply |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Sewerage |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Storm Water Drains |
YES |
05-03-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Landscaping |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Street Lighting |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Community Buildings |
NO |
— |
— |
0 |
— |
| Treatment And Disposal |
NO |
— |
— |
0 |
— |
| Solid Waste Management |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Water Conservation |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Energy Management |
NO |
— |
— |
0 |
— |
| Fire Protection |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Electrical Meter Room |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Fire Fighting |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Drinking Water Facilities |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Emergency Evacuation |
YES |
01-04-2025 |
31-01-2028 |
0 |
AS PER PLAN |
| Use Of Renewable Energy |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
| Security |
NO |
— |
— |
0 |
— |
| Letter Box |
YES |
01-04-2025 |
31-01-2028 |
100 |
AS PER PLAN |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| H7 |
1 |
Shop |
63.07 |
0 |
BOOKED |
1,97,04,000 |
30,00,000 |
1,67,04,000 |
Created |
| H7 |
2 |
Shop |
65.8 |
0 |
BOOKED |
2,07,87,000 |
22,00,000 |
1,85,87,000 |
Created |
| H7 |
3 |
Shop |
65.8 |
0 |
BOOKED |
2,08,87,000 |
22,00,000 |
1,86,87,000 |
Created |
| H7 |
4 |
Shop |
61.63 |
0 |
BOOKED |
1,92,13,000 |
2,00,000 |
1,90,13,000 |
Created |
| H7 |
101 (Hostel) |
Residential |
2660.42 |
0 |
BOOKED |
34,62,81,350 |
12,08,44,000 |
22,54,37,350 |
Created |
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
HRISHIKESH VENTURES LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AANFH7259P |
| Company / Firm Registration No. |
AAV8035 |
| Date of Incorporation |
09-02-2021 |
| Status |
REGISTERED |
| Registered Address |
501, HRISHIKESH BUILDING VASANT BAUG, OFF C G ROAD |
| Taluka / District / State |
Ahmedabad City / Ahmedabad / Gujarat |
| Pin Code |
380006 |
| E-mail |
hrishikeshenterprise@gmail.com |
| Mobile |
9099926343 |
| Telephone |
— |
| Website |
www.hrishikeshgroup.com |
| Registered On |
15-12-2023 |
3.2 Developer Group / Track Record
| Field |
Value |
| Developer Group |
HRISHIKESH VENTURES LLP |
| Promoter Enterprise |
Limited Liability Partnership |
| Total Projects |
1 |
| Projects Completed |
1 |
| Ongoing Projects |
1 |
| Total Area Constructed |
2744 |
| Experience in Gujarat |
5 |
| Experience in Other States |
0 |
| Group History |
5 |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| RUPESH PRAVINBHAI SHAH |
ASLPS2148E |
9825119967 |
hrishikeshrealtyllp@gmail.com |
402, H1 , UNIQUE PARK OPPOSITE ISRO |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
| NEEL SHRIKANT GIRISH |
AHOPG0274H |
9099926343 |
neelsgirish@gmail.com |
B501 SPRING VALLEY APARTMENT DOCTOR HOUSE |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380006 |
| AKASH SNEHAL SHAH |
DHNPS3439G |
9426758282 |
shahakash9244@gmail.com |
22A VISHRAM PARK SOCIETY VASNA |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380007 |
3 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| NEEL SHRIKANT GIRISH |
AHOPG0274H |
9099926343 |
neelsgirish@gmail.com |
B501, SPRING VALLEY APARTMENT DOCTOR HOUSE, AMBAWADI |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380006 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| H10 |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA16679/060426/300628 |
Residential/Group Housing |
New |
HRISHIKESH VENTURES LLP |
04-12-2025 |
30-06-2028 |
Ahmedabad |
Ahmedabad City |
| H7 |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA14549/A1R/121125/120228 |
Mixed Development |
New |
HRISHIKESH VENTURES LLP |
14-08-2024 |
12-02-2028 |
Ahmedabad |
Ahmedabad City |
| H6 |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA12138/EX1/EX2/251125/300426 |
Residential/Group Housing |
New |
HRISHIKESH VENTURES LLP |
13-04-2023 |
30-04-2026 |
Ahmedabad |
Ahmedabad City |
| H3 |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/RAA09103/270921 |
Residential/Group Housing |
New |
HRISHIKESH VENTURES LLP |
07-08-2021 |
31-12-2023 |
Ahmedabad |
Ahmedabad City |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Pincode |
Opening Balance (₹) |
Closing Balance (₹) |
| ICICI BANK LIMITED |
HERITAGE CHAMBERS |
HRISHIKESH VENTURES LLP H7 RERA RETENTION ACCOUNT |
403105000757 |
ICIC0004031 |
Ahmedabad / Ahmedabad City |
380015 |
0 |
0 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
88 |
| Time Lapsed (%) |
32.73 |
| RERA Assessment |
ill |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| October 2025 |
100 |
| January 2026 |
100 |
| March 2028 |
99.06 |
4.3 Block-wise Construction Progress
| Block |
Development Start |
Development End |
Block Progress (%) |
Form-B Report (%) |
Form-B Period |
| 26 |
28-07-2016 |
30-06-2025 |
0 |
18.5 |
28-07-2016 → 30-06-2025 |
| 67 |
28-07-2016 |
30-06-2025 |
0 |
18.5 |
28-07-2016 → 30-06-2025 |
| 200 |
28-07-2016 |
30-06-2025 |
0 |
18.5 |
28-07-2016 → 30-06-2025 |
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
Dec-24 – Mar-25 |
31-03-2025 |
07-04-2025 |
08-04-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-2 |
Apr-25 – Jun-25 |
30-06-2025 |
07-07-2025 |
07-07-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-3 |
Jul-25 – Sep-25 |
30-09-2025 |
07-10-2025 |
07-10-2025 |
SUBMITTED |
— |
— |
— |
— |
| Q-4 |
Oct-25 – Dec-25 |
31-12-2025 |
07-01-2026 |
07-01-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-5 |
Jan-26 – Mar-26 |
31-03-2026 |
07-04-2026 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-6 |
Apr-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-7 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-8 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-9 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-10 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-11 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-12 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Jan-28 – Feb-28 |
11-02-2028 |
11-02-2028 |
19-03-2026 |
SUBMITTED |
— |
— |
EMAIL_SENT_TO_PROMOTER |
— |
| BWA-1 |
Apr-25 – Jun-25 |
29-06-2025 |
29-06-2025 |
21-04-2025 |
SUBMITTED |
— |
— |
— |
— |
| BWA-2 |
Jul-25 – Sep-25 |
29-09-2025 |
29-09-2025 |
16-07-2025 |
SUBMITTED |
— |
— |
— |
— |
| BWA-3 |
Oct-25 – Oct-35 |
14-10-2035 |
14-10-2035 |
— |
ACTIVE |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2024-25 |
SUBMITTED |
10-12-2025 |
Form 5 PDF |
| 2025-26 |
SUBMITTED |
18-03-2026 |
Form 5 PDF |
| 2026-27 |
ACTIVE |
— |
— |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA14549/A1R/121125/120228 |
18-09-2024 |
20-12-2024 |
— |
— |
— |
— |
— |
— |
— |
| Alteration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA14549/A1R/121125/120228 |
22-08-2025 |
12-11-2025 |
— |
— |
— |
— |
— |
— |
— |
| Complaint |
SMC/SELL/ONLINE/Ahmedabad/29112025/00669 |
29-11-2025 |
— |
CMP2911202501554 |
HEARING_SCHEDULE |
— |
— |
— |
— |
— |
| Annual Compliance |
2024-25 |
109934 |
10-12-2025 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2025-26 |
109934 |
18-03-2026 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
ACTIVE |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
— |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
43 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/24465 |
ok |
| applications |
project_reg/public/projectAllApplications/24465 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/24465 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/24465 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/24465 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/24465 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/24465 |
ok |
| core |
project_reg/public/alldatabyprojectid/24465 |
ok |
| form_eight |
quarter/getformpdf-by-id/24465 |
ok |
| form_four |
quarter/get-by-project-id/24465 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/285466 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/24465/18942 |
ok |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/24465 |
ok |
| form_three |
formthree/public/getform-three-byid/423930 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/24465 |
ok |
| form_two |
formtwo/public/getform-two-by-id/164433 |
ok |
| joint_development |
project_reg/public/land-owner/project24465 |
ok |
| location |
maplocation/public/getProjectLocations/24465 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/24465 |
ok |
| profile |
project_reg/public/getproject-details/24465 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/24465 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/24465 |
ok |
| promoter |
user_reg/promoter/promoter18273 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/24465 |
ok |
| qpr_progress |
quarter/get-project-progress/24465 |
ok |
| quarters |
quarter/public/getprojectqtrs/24465 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/240918/024465 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.
NAVRATNA GULMOHAR PARK
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16224/181225/311232
Project ID: 29195
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Mixed Development
Promoter: NAVRATNA S G HIGHWAY PROPERTIES PVT LTD (COMPANY)
Registered On: 18-12-2025
Declared Completion: 30-04-2033
Construction Progress (as published): 2% (On Track)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:09
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
NAVRATNA GULMOHAR PARK |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16224/181225/311232 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/251114/029195 |
| Project Address |
F P NO. 167 to 172 & 174 to 178, TP NO. 6(VEJALPUR) OPP. SATELLITED POLICE STATION, SATELLITE ROAD |
| Moje / Village |
VEJALPUR |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
GUJARAT |
| Pin Code |
380015 |
| Project Type |
Mixed Development |
| About Property |
MIXED DEVELOPMENT |
| Project Start Date |
14-10-2025 |
| Project End Date |
30-04-2033 |
| Project Land Area (sq m) |
8429 |
| Total Open Area (sq m) |
5204.33 |
| Total Covered Area (sq m) |
3224.67 |
| Total Carpet Area (sq m) |
39566.63 |
| Carpet Area Range (sq m) |
90.47 – 688.6 |
| Total Units |
170 |
| Plan Passing Authority |
Ahmedabad Municipal Corporation |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS — · Block — · TP 6 (VEJALPUR) · FP 167 TO 172 & 174 TO 178 |
| Project Status |
New |
| Project Cost (₹) |
₹ 3,75,82,00,000 (Form 2-A + 2-B estimates) |
| Unit Price Range (₹) |
₹ 1,40,40,000 – ₹ 18,31,70,000 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Office |
A |
125 |
0 |
125 |
16331.95 |
| Residential |
A |
40 |
0 |
40 |
20946.44 |
| Shop |
A |
5 |
0 |
5 |
2288.24 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| A |
0 |
170 |
0 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
NAVRATNA S G HIGHWAY PROPERTIES PVT LTD |
| Promoter Type |
COMPANY |
| PAN |
AACCN2111Q |
| Registration No. |
U45200GJ2005PTC046351 |
| Office Address |
A-Block, Navratna Business Park, Sindhubhavan Road, Bodakdev, Ahmedabad Ahmedabad City Ahmedabad GUJARAT 380054 |
| E-mail |
accounts@navratna.com |
| Mobile |
8347799090 |
| Partners / Associates |
2 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
31 |
| Total Complied Quarters |
3 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
2 |
| Total Complied Annual Compliance |
1 |
| Total Annual Compliance Defaulted |
1 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
STATE BANK OF INDIA |
| Branch |
OVERSEAS BR AHMEDABAD |
| Account Name |
NAVRATNA SG HIGHWAY PROPERTIES PVT LTD RERA COLLECTION BANK AC FOR NAVRATNA GULMOHAR PARK |
| Account Number |
44516819245 |
| IFSC |
SBIN0004038 |
| District / Taluka |
Ahmedabad / Ahmedabad City |
| Pincode |
380015 |
1.6 Construction Booking Status
| Block |
Block Progress (%) |
Form-B Report (%) |
Un-booked Units |
Development Period |
| A+B |
9.75 |
0 |
— |
05-07-2019 → 30-06-2025 |
| C+D |
18.75 |
0 |
— |
05-07-2019 → 30-06-2025 |
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16224/181225/311232 |
14-11-2025 |
18-12-2025 |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2025-26 |
037674 |
31-10-2026 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2029-30 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2030-31 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2031-32 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2032-33 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| LEGAL_PCWF |
LEGAL/0002523/10082026 |
10-08-2026 |
— |
— |
— |
Enquiry |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| A |
3,57,92,00,000 |
9,52,13,971 |
3 |
3,48,39,86,029 |
31-10-2025 |
| Form 2-B — common infrastructure |
17,90,00,000 |
0 |
0 |
17,90,00,000 |
31-10-2025 |
| Total |
3,75,82,00,000 |
9,52,13,971 |
2.53 |
3,66,29,86,029 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
F P NO. 167 to 172 & 174 to 178, TP NO. 6(VEJALPUR) OPP. SATELLITED POLICE STATION, SATELLITE ROAD |
| Moje |
VEJALPUR |
| Revenue Survey No. |
— |
| City Survey No. |
00290034, Sheet No.0029 |
| Block No. |
— |
| TP / Scheme |
6 / VEJALPUR |
| Final Plot No. |
167 TO 172 & 174 TO 178 |
| Approving Authority |
Ahmedabad Municipal Corporation |
| Land Area for Project (sq m) |
8429 |
| Total Land Area of Layout (sq m) |
8429 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
1330 / 28822.47 |
| Parking for Sale (nos) |
146 |
| Open Parking Area (sq m) |
1240.93 |
| Map Coordinates |
23.027094620094992, 72.5095347987122; 23.026054832987818, 72.50970377788013; 23.02610420317038, 72.51022949084705; 23.02721502749809, 72.5101651178307 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Not published |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
Local Authority |
| Swimming Pool Capacity |
— |
| Water Supply Flag |
Yes |
| Sewage Disposal Flag |
Yes |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| Shop |
5 |
0 |
2288.24 |
0 |
0 |
| Office |
125 |
0 |
16331.95 |
0 |
442.05 |
| Flat |
40 |
0 |
20946.44 |
2856.4 |
313.7 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
| Minesh Anilbhai Prajapati |
CA/2014/64829 |
9978270867 |
thearchitectsdiary89@gmail.com |
10 |
7 |
604, Arizona, near hyatt regency, ashram road, usamanpura, |
Structural Engineer(s)
| Name |
Licence No. |
PAN |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| KETAN JITENDRA VADODARIYA |
1114CW25032800559 |
AANPV7148M |
9825360087 |
kvadodariya@yahoo.com |
60 |
24 |
B/401 KALGI APPARTMENT |
ACTIVE |
Chartered Accountant(s)
— (no records)
Contractor(s)
— (no records)
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| A |
14-10-2025 |
31-12-2032 |
161.54 |
45016.23 |
108459.49 |
07243/310724/A8507/R0/M1 |
14-10-2025 |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
291195 |
| Form Status |
UPLOADED |
| Architect |
MINESH ANILBHAI PRAJAPATI |
| COA Registration No. |
CA/2014/64829 |
| Valid Till |
31-12-2033 |
| Physical Site Visit Date |
26-11-2025 |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
14-10-2025 |
| Project End |
31-12-2032 |
| Remark |
NAVRATNA GUILMOHAR PARK |
| Submitted On |
26-11-2025 |
Form 1-A — Work Completed per Block
| Block |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| A |
28 |
0 / 5 |
0 |
0 |
0 / 39 |
0 |
0 |
0 |
0 |
0 |
Form 1-A — Construction Schedule: Block A
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
15-10-2025 |
01-07-2026 |
— |
— |
| Plinth |
15-07-2026 |
14-07-2027 |
— |
— |
| Podium |
— |
— |
— |
— |
| Stilt |
— |
— |
— |
— |
| Slab / RCC |
08-01-2027 |
31-07-2030 |
— |
— |
| Internal Finishing |
01-01-2028 |
30-06-2031 |
— |
— |
| Sanitary Fittings |
07-01-2029 |
30-06-2031 |
— |
— |
| Staircase |
08-01-2027 |
31-07-2030 |
— |
— |
| External Development |
10-01-2031 |
31-03-2032 |
— |
— |
| Installation |
04-01-2032 |
31-12-2032 |
— |
— |
| Common Area |
— |
— |
— |
— |
1 site progress photograph attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
217180 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
Remarks |
| Internal Road |
YES |
01-01-2026 |
30-05-2032 |
0 |
WORK NOT START |
| Water Supply |
NO |
— |
— |
0 |
— |
| Sewerage |
YES |
07-01-2029 |
30-06-2032 |
0 |
WORK NOT START |
| Storm Water Drains |
YES |
07-01-2029 |
30-06-2032 |
0 |
WORK NOT START |
| Landscaping |
YES |
04-01-2032 |
30-09-2032 |
0 |
WORK NOT START |
| Street Lighting |
NO |
— |
— |
0 |
— |
| Community Buildings |
NO |
— |
— |
0 |
— |
| Treatment And Disposal |
YES |
07-01-2029 |
31-12-2032 |
0 |
WORK NOT START |
| Solid Waste Management |
YES |
07-01-2029 |
30-06-2032 |
0 |
WORK NOT START |
| Water Conservation |
YES |
07-01-2029 |
30-06-2032 |
0 |
WORK NOT START |
| Energy Management |
YES |
07-01-2032 |
31-12-2032 |
0 |
WORK NOT START |
| Fire Protection |
YES |
07-01-2031 |
30-06-2032 |
0 |
WORK NOT START |
| Electrical Meter Room |
YES |
01-01-2032 |
30-06-2032 |
0 |
WORK NOT START |
| Fire Fighting |
YES |
07-01-2031 |
30-06-2032 |
0 |
WORK NOT START |
| Drinking Water Facilities |
YES |
07-01-2031 |
30-06-2032 |
0 |
WORK NOT START |
| Emergency Evacuation |
YES |
07-01-2031 |
30-06-2032 |
0 |
WORK NOT START |
| Use Of Renewable Energy |
YES |
07-01-2032 |
31-12-2032 |
0 |
WORK NOT START |
| Security |
NO |
— |
— |
0 |
— |
| Letter Box |
NO |
— |
— |
0 |
— |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| A |
1 |
Shop |
682.05 |
0 |
UNBOOKED |
18,14,30,000 |
0 |
18,14,30,000 |
No Encumbrance |
| A |
2 |
Shop |
688.6 |
0 |
UNBOOKED |
18,31,70,000 |
0 |
18,31,70,000 |
No Encumbrance |
| A |
3 |
Shop |
683.68 |
0 |
UNBOOKED |
18,18,60,000 |
0 |
18,18,60,000 |
No Encumbrance |
| A |
4 |
Shop |
143.44 |
0 |
UNBOOKED |
3,77,20,000 |
0 |
3,77,20,000 |
No Encumbrance |
| A |
101 |
Shop |
90.47 |
0 |
UNBOOKED |
2,37,90,000 |
0 |
2,37,90,000 |
No Encumbrance |
| A |
201 |
Office |
294.04 |
148.67 |
UNBOOKED |
9,93,10,000 |
0 |
9,93,10,000 |
No Encumbrance |
| A |
202 |
Office |
336.96 |
146.69 |
UNBOOKED |
11,03,10,000 |
0 |
11,03,10,000 |
No Encumbrance |
| A |
203 |
Office |
223.07 |
0 |
UNBOOKED |
5,13,10,000 |
0 |
5,13,10,000 |
No Encumbrance |
| A |
204 |
Office |
221.87 |
0 |
UNBOOKED |
4,65,90,000 |
0 |
4,65,90,000 |
No Encumbrance |
| A |
205 |
Office |
335.47 |
146.69 |
UNBOOKED |
10,99,10,000 |
0 |
10,99,10,000 |
No Encumbrance |
| A |
301 |
Office |
143.68 |
0 |
UNBOOKED |
2,19,80,000 |
0 |
2,19,80,000 |
No Encumbrance |
| A |
302 |
Office |
124.8 |
0 |
UNBOOKED |
1,90,90,000 |
0 |
1,90,90,000 |
No Encumbrance |
| A |
303 |
Office |
207.87 |
0 |
UNBOOKED |
3,18,00,000 |
0 |
3,18,00,000 |
No Encumbrance |
| A |
304 |
Office |
111.48 |
0 |
UNBOOKED |
1,70,60,000 |
0 |
1,70,60,000 |
No Encumbrance |
| A |
305 |
Office |
91.76 |
0 |
UNBOOKED |
1,40,40,000 |
0 |
1,40,40,000 |
No Encumbrance |
| A |
306 |
Office |
91.76 |
0 |
UNBOOKED |
1,40,40,000 |
0 |
1,40,40,000 |
No Encumbrance |
| A |
307 |
Office |
111.48 |
0 |
UNBOOKED |
1,70,60,000 |
0 |
1,70,60,000 |
No Encumbrance |
| A |
308 |
Office |
207.87 |
0 |
UNBOOKED |
3,18,00,000 |
0 |
3,18,00,000 |
No Encumbrance |
| A |
309 |
Office |
124.8 |
0 |
UNBOOKED |
1,90,90,000 |
0 |
1,90,90,000 |
No Encumbrance |
| A |
310 |
Office |
143.68 |
0 |
UNBOOKED |
2,19,80,000 |
0 |
2,19,80,000 |
No Encumbrance |
| A |
401 |
Office |
143.68 |
0 |
UNBOOKED |
2,19,80,000 |
0 |
2,19,80,000 |
No Encumbrance |
| A |
402 |
Office |
124.8 |
0 |
UNBOOKED |
1,90,90,000 |
0 |
1,90,90,000 |
No Encumbrance |
| A |
403 |
Office |
207.87 |
0 |
UNBOOKED |
3,18,00,000 |
0 |
3,18,00,000 |
No Encumbrance |
| A |
404 |
Office |
111.48 |
0 |
UNBOOKED |
1,70,60,000 |
0 |
1,70,60,000 |
No Encumbrance |
| A |
405 |
Office |
91.76 |
0 |
UNBOOKED |
1,40,40,000 |
0 |
1,40,40,000 |
No Encumbrance |
Showing first 25 of 170 units — full list in raw/form_three.json.
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
NAVRATNA S G HIGHWAY PROPERTIES PVT LTD |
| Promoter Type |
COMPANY |
| PAN |
AACCN2111Q |
| Company / Firm Registration No. |
U45200GJ2005PTC046351 |
| Date of Incorporation |
01-07-2005 |
| Status |
REGISTERED |
| Registered Address |
A-Block, Navratna Business Park, Sindhubhavan Road, Bodakdev, Ahmedabad |
| Taluka / District / State |
Ahmedabad City / Ahmedabad / GUJARAT |
| Pin Code |
380054 |
| E-mail |
accounts@navratna.com |
| Mobile |
8347799090 |
| Telephone |
— |
| Website |
— |
| Registered On |
11-09-2025 |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| DINESH ANUBHAI SHAH |
ADFPS9925G |
9825017900 |
info@navratna.com |
9, SHALIMAR KRISHNA SOCIETY ELLISBRIDGE, AHMEDABAD |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380006 |
| MURLIDHAR MARUTIBHAI TRIVEDI |
ABGPT1148M |
9825015900 |
murli.trivedi@navratna.com |
71, BRAHMIN MITRA MANDAL SOCIETY OPP. JALARAM TEMPLE, ELLISBRIDGE, AHMEDABAD |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380006 |
2 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| MURLIDHAR MARUTIBHAI TRIVEDI |
ABGPT1148M |
9825015900 |
murli.trivedi@navratna.com |
71, BRAHMIN MITRA MANDAL SOCIETY OPP. JALARAM TEMPLE, ELLISBRIDGE, AHMEDABAD |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380006 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| NAVRATNA GULMOHAR PARK |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16224/181225/311232 |
Mixed Development |
New |
NAVRATNA S G HIGHWAY PROPERTIES PVT LTD |
14-10-2025 |
30-04-2033 |
Ahmedabad |
Ahmedabad City |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Pincode |
| STATE BANK OF INDIA |
OVERSEAS BR AHMEDABAD |
NAVRATNA SG HIGHWAY PROPERTIES PVT LTD RERA RETENTION BANK AC FOR NAVRATNA GULMOHAR PARK |
44503769863 |
SBIN0004038 |
Ahmedabad / Ahmedabad City |
380015 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
3 |
| Time Lapsed (%) |
1.56 |
| RERA Assessment |
On Track |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| April 2026 |
2.6 |
| July 2026 |
2.6 |
| October 2026 |
6 |
4.3 Block-wise Construction Progress
| Block |
Development Start |
Development End |
Block Progress (%) |
Form-B Report (%) |
Form-B Period |
| A+B |
05-07-2019 |
30-06-2025 |
9.75 |
0 |
05-07-2019 → 30-06-2025 |
| C+D |
05-07-2019 |
30-06-2025 |
18.75 |
0 |
05-07-2019 → 30-06-2025 |
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
Dec-25 – Mar-26 |
31-03-2026 |
07-04-2026 |
04-04-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-2 |
Apr-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
03-07-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-3 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
07-10-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-4 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
ACTIVE |
— |
— |
— |
— |
| Q-5 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-6 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-7 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-8 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-9 |
Jan-28 – Mar-28 |
31-03-2028 |
07-04-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-10 |
Apr-28 – Jun-28 |
30-06-2028 |
07-07-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-11 |
Jul-28 – Sep-28 |
30-09-2028 |
07-10-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-12 |
Oct-28 – Dec-28 |
31-12-2028 |
07-01-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-13 |
Jan-29 – Mar-29 |
31-03-2029 |
07-04-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-14 |
Apr-29 – Jun-29 |
30-06-2029 |
07-07-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-15 |
Jul-29 – Sep-29 |
30-09-2029 |
07-10-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-16 |
Oct-29 – Dec-29 |
31-12-2029 |
07-01-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-17 |
Jan-30 – Mar-30 |
31-03-2030 |
07-04-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-18 |
Apr-30 – Jun-30 |
30-06-2030 |
07-07-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-19 |
Jul-30 – Sep-30 |
30-09-2030 |
07-10-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-20 |
Oct-30 – Dec-30 |
31-12-2030 |
07-01-2031 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-21 |
Jan-31 – Mar-31 |
31-03-2031 |
07-04-2031 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-22 |
Apr-31 – Jun-31 |
30-06-2031 |
07-07-2031 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-23 |
Jul-31 – Sep-31 |
30-09-2031 |
07-10-2031 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-24 |
Oct-31 – Dec-31 |
31-12-2031 |
07-01-2032 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-25 |
Jan-32 – Mar-32 |
31-03-2032 |
07-04-2032 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-26 |
Apr-32 – Jun-32 |
30-06-2032 |
07-07-2032 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-27 |
Jul-32 – Sep-32 |
30-09-2032 |
07-10-2032 |
— |
INACTIVE |
— |
— |
— |
— |
| X-1 |
Oct-32 – Dec-32 |
31-12-2032 |
07-01-2033 |
— |
INACTIVE |
— |
— |
— |
— |
| BWA-1 |
Aug-26 – Aug-36 |
17-08-2036 |
17-08-2036 |
— |
ACTIVE |
— |
— |
— |
— |
| X-2 |
Jan-33 – Mar-33 |
31-03-2033 |
07-04-2033 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Apr-33 – Apr-33 |
30-04-2033 |
30-04-2033 |
— |
ACTIVE |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2025-26 |
SUBMITTED |
31-10-2026 |
Form 5 PDF |
| 2026-27 |
INACTIVE |
— |
— |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16224/181225/311232 |
14-11-2025 |
18-12-2025 |
— |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2025-26 |
037674 |
31-10-2026 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2029-30 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2030-31 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2031-32 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2032-33 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| LEGAL_PCWF |
LEGAL/0002523/10082026 |
10-08-2026 |
— |
— |
— |
— |
— |
— |
— |
Enquiry |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
Available |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
22 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/29195 |
ok |
| applications |
project_reg/public/projectAllApplications/29195 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/29195 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/29195 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/29195 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/29195 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/29195 |
ok |
| core |
project_reg/public/alldatabyprojectid/29195 |
ok |
| form_eight |
quarter/getformpdf-by-id/29195 |
ok |
| form_four |
quarter/get-by-project-id/29195 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/291195 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/29195/21256 |
ok |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/29195 |
ok |
| form_three |
formthree/public/getform-three-byid/425038 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/29195 |
ok |
| form_two |
formtwo/public/getform-two-by-id/165423 |
ok |
| joint_development |
project_reg/public/land-owner/project29195 |
ok |
| location |
maplocation/public/getProjectLocations/29195 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/29195 |
ok |
| profile |
project_reg/public/getproject-details/29195 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/29195 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/29195 |
ok |
| promoter |
user_reg/promoter/promoter23146 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/29195 |
ok |
| qpr_progress |
quarter/get-project-progress/29195 |
ok |
| quarters |
quarter/public/getprojectqtrs/29195 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/251114/029195 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.
SWASTIK DEVKUNJ
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16160/281125/310329
Project ID: 29254
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Mixed Development
Promoter: RMG INFRACARE PRIVATE LIMITED (COMPANY)
Registered On: 28-11-2025
Declared Completion: 31-07-2029
Construction Progress (as published): 2% (Slow)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:20
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
SWASTIK DEVKUNJ |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16160/281125/310329 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/251115/029254 |
| Project Address |
ASHOKA DEVKUNJ, NEAR SARTHAK EDUCATIONAL CENTRE, SATTADHAR CHAR RASTA, GHATLODIA, AHMEDABAD |
| Moje / Village |
GHATLODIA |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
GUJARAT |
| Pin Code |
380061 |
| Project Type |
Mixed Development |
| About Property |
SHOPS AND 2 BHK LUXURIOUS APARTMENTS |
| Project Start Date |
15-11-2025 |
| Project End Date |
31-07-2029 |
| Project Land Area (sq m) |
1971.29 |
| Total Open Area (sq m) |
1262.95 |
| Total Covered Area (sq m) |
708.34 |
| Total Carpet Area (sq m) |
6610.64 |
| Carpet Area Range (sq m) |
10.17 – 166.6 |
| Total Units |
122 |
| Plan Passing Authority |
Ahmedabad Municipal Corporation |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS 71 · Block — · TP 01 (GHATLODIA) · FP 160 + 161 + 164 + 165 |
| Project Status |
New |
| Project Cost (₹) |
₹ 15,00,00,000 (Form 2-A + 2-B estimates) |
| Unit Price Range (₹) |
₹ 0 – ₹ 9,00,00,000 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Flat |
A+B |
108 |
82 |
26 |
6065.99 |
| Shop |
A+B |
14 |
2 |
12 |
544.65 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| A+B |
84 |
38 |
68.85 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
RMG INFRACARE PRIVATE LIMITED |
| Promoter Type |
COMPANY |
| PAN |
AANCR9634F |
| Registration No. |
U42903GJ2024PTC155206 |
| Office Address |
B/705, Atma House, Opp Reserve Bank, Ashram Road, Ahmedabad Ahmedabad City Ahmedabad GUJARAT 380009 |
| E-mail |
rmginfracare@gmail.com |
| Mobile |
9909596696 |
| Partners / Associates |
2 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
17 |
| Total Complied Quarters |
4 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
2 |
| Total Complied Annual Compliance |
1 |
| Total Annual Compliance Defaulted |
1 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
AXIS BANK |
| Branch |
ASHRAM ROAD |
| Account Name |
RMG INFRACARE PRIVATE LIMITED RERA COLLECTION BANK ACCOUNT SWASTIK DEVKUNJ |
| Account Number |
926020027790897 |
| IFSC |
UTIB0002642 |
| District / Taluka |
Ahmedabad / Ahmedabad City |
| Pincode |
380009 |
1.6 Construction Booking Status
— (no construction progress records published)
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16160/281125/310329 |
15-11-2025 |
28-11-2025 |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2025-26 |
600627 |
31-10-2026 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| BCR |
BCR/0004095/26072026R2 |
26-07-2026 |
18-08-2026 |
— |
— |
Approved |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| A+B |
13,50,00,000 |
1,00,00,000 |
7 |
12,50,00,000 |
31-05-2026 |
| Form 2-B — common infrastructure |
1,50,00,000 |
0 |
0 |
1,50,00,000 |
31-05-2026 |
| Total |
15,00,00,000 |
1,00,00,000 |
6.67 |
14,00,00,000 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
ASHOKA DEVKUNJ, NEAR SARTHAK EDUCATIONAL CENTRE, SATTADHAR CHAR RASTA, GHATLODIA, AHMEDABAD |
| Moje |
GHATLODIA |
| Revenue Survey No. |
71 |
| City Survey No. |
— |
| Block No. |
— |
| TP / Scheme |
01 / GHATLODIA |
| Final Plot No. |
160 + 161 + 164 + 165 |
| Approving Authority |
Ahmedabad Municipal Corporation |
| Land Area for Project (sq m) |
1971.29 |
| Total Land Area of Layout (sq m) |
1971.29 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
215 / 1461.92 |
| Parking for Sale (nos) |
36 |
| Open Parking Area (sq m) |
262.21 |
| Map Coordinates |
23.064528109919316, 72.53159173979682; 23.06439855011869, 72.53190287604255; 23.0647526799449, 72.53211477055473; 23.064921724167462, 72.53176608338279 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Available |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
Local Authority |
| Swimming Pool Capacity |
— |
| Water Supply Flag |
Yes |
| Sewage Disposal Flag |
Yes |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| Flat |
108 |
80 |
6065.99 |
617.07 |
79.56 |
| Shop |
14 |
0 |
544.65 |
0 |
0 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
| Kishankumar Arvindkumar Talshaniya |
CA/2017/82482 |
9725175296 |
info@vpadstudio.com |
10 |
9 |
Fortune Hub, 110, Science City Rd, near Shell Petrol Pump, |
Structural Engineer(s)
| Name |
Licence No. |
PAN |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| MEET H CHOKSHI |
001SE13043010510 |
BDAPC1984K |
9313199368 |
rera.creativecolumn1508@gmail.com |
50 |
5 |
7, ADITYA DUPLEX, OPP. REVAPARK GARDEN |
ACTIVE |
Chartered Accountant(s)
— (no records)
Contractor(s)
— (no records)
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| A+B |
01-12-2025 |
30-03-2029 |
44.94 |
7593.27 |
11416.29 |
07179/300725/A9507/R0/M1 |
06-10-2025 |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
320650 |
| Form Status |
UPLOADED |
| Architect |
BHAUMIKKUMAR CHANDRAVADANBHAI DONGA |
| COA Registration No. |
CA/2018/91406 |
| Valid Till |
31-12-2029 |
| Physical Site Visit Date |
08-06-2026 |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
15-11-2025 |
| Project End |
31-03-2029 |
| Remark |
na |
| Submitted On |
08-06-2026 |
Form 1-A — Work Completed per Block
| Block |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| A+B |
100 |
20 / 1 |
0 |
0 |
0 / 15 |
0 |
0 |
0 |
0 |
0 |
Form 1-A — Construction Schedule: Block A+B
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
01-12-2025 |
31-03-2026 |
— |
— |
| Plinth |
01-04-2026 |
31-07-2026 |
— |
— |
| Podium |
— |
— |
— |
— |
| Stilt |
01-08-2026 |
30-08-2026 |
— |
— |
| Slab / RCC |
01-09-2026 |
31-08-2027 |
— |
— |
| Internal Finishing |
01-04-2027 |
31-07-2028 |
— |
— |
| Sanitary Fittings |
01-09-2028 |
31-12-2028 |
— |
— |
| Staircase |
01-09-2026 |
31-07-2028 |
— |
— |
| External Development |
01-12-2027 |
31-10-2028 |
— |
— |
| Installation |
01-01-2028 |
31-12-2028 |
— |
— |
| Common Area |
— |
— |
— |
— |
2 site progress photographs attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
238091 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
| Internal Road |
YES |
01-01-2028 |
31-10-2028 |
0 |
| Water Supply |
YES |
01-01-2027 |
30-09-2028 |
0 |
| Sewerage |
YES |
01-03-2028 |
31-10-2028 |
0 |
| Storm Water Drains |
YES |
01-02-2028 |
30-09-2028 |
0 |
| Landscaping |
YES |
01-03-2028 |
30-09-2028 |
0 |
| Street Lighting |
YES |
01-06-2028 |
31-08-2028 |
0 |
| Community Buildings |
NO |
— |
— |
0 |
| Treatment And Disposal |
NO |
— |
— |
0 |
| Solid Waste Management |
YES |
01-07-2028 |
30-09-2028 |
0 |
| Water Conservation |
YES |
01-07-2028 |
30-11-2028 |
0 |
| Energy Management |
YES |
01-07-2028 |
30-11-2028 |
0 |
| Fire Protection |
YES |
01-06-2028 |
30-11-2028 |
0 |
| Electrical Meter Room |
YES |
01-06-2028 |
30-09-2028 |
0 |
| Fire Fighting |
YES |
01-07-2028 |
31-10-2028 |
0 |
| Drinking Water Facilities |
YES |
01-06-2028 |
31-10-2028 |
0 |
| Emergency Evacuation |
YES |
01-01-2028 |
31-10-2028 |
0 |
| Use Of Renewable Energy |
YES |
01-06-2028 |
31-10-2028 |
0 |
| Security |
YES |
01-06-2028 |
31-12-2028 |
0 |
| Letter Box |
YES |
01-09-2028 |
30-11-2028 |
0 |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| A+B |
A-1 |
Shop |
27.17 |
0 |
UNBOOKED |
65,00,000 |
0 |
65,00,000 |
No Encumbrance |
| A+B |
A-2 |
Shop |
27.86 |
0 |
UNBOOKED |
65,00,000 |
0 |
65,00,000 |
No Encumbrance |
| A+B |
A-3 |
Shop |
28.98 |
0 |
UNBOOKED |
67,00,000 |
0 |
67,00,000 |
No Encumbrance |
| A+B |
A-4 |
Shop |
27.38 |
0 |
UNBOOKED |
65,00,000 |
0 |
65,00,000 |
No Encumbrance |
| A+B |
A-5 |
Shop |
25.91 |
0 |
UNBOOKED |
60,00,000 |
0 |
60,00,000 |
No Encumbrance |
| A+B |
A-6 |
Shop |
25.22 |
0 |
UNBOOKED |
60,00,000 |
0 |
60,00,000 |
No Encumbrance |
| A+B |
A-7 |
Shop |
22.51 |
0 |
BOOKED |
53,00,000 |
1,00,000 |
52,00,000 |
No Encumbrance |
| A+B |
A-8 |
Shop |
21.6 |
0 |
BOOKED |
52,00,000 |
1,00,000 |
51,00,000 |
No Encumbrance |
| A+B |
A-9 |
Shop |
20.59 |
0 |
UNBOOKED |
50,00,000 |
0 |
50,00,000 |
No Encumbrance |
| A+B |
A-10 |
Shop |
10.17 |
0 |
UNBOOKED |
30,00,000 |
0 |
30,00,000 |
No Encumbrance |
| A+B |
A-11 |
Shop |
16.94 |
0 |
UNBOOKED |
40,00,000 |
0 |
40,00,000 |
No Encumbrance |
| A+B |
A-12 |
Shop |
10.69 |
0 |
UNBOOKED |
30,00,000 |
0 |
30,00,000 |
No Encumbrance |
| A+B |
A-Shop-101 |
Shop |
166.6 |
0 |
UNBOOKED |
1,15,00,000 |
0 |
1,15,00,000 |
No Encumbrance |
| A+B |
A-Shop-102 |
Shop |
113.03 |
0 |
UNBOOKED |
9,00,00,000 |
0 |
9,00,00,000 |
No Encumbrance |
| A+B |
A-101 |
Flat |
55.33 |
5.55 |
BOOKED |
0 |
0 |
0 |
No Encumbrance |
| A+B |
A-102 |
Flat |
55.33 |
24.27 |
UNBOOKED |
55,00,000 |
0 |
55,00,000 |
No Encumbrance |
| A+B |
A-201 |
Flat |
55.33 |
5.55 |
BOOKED |
0 |
0 |
0 |
No Encumbrance |
| A+B |
A-202 |
Flat |
55.33 |
5.55 |
UNBOOKED |
55,00,000 |
0 |
55,00,000 |
No Encumbrance |
| A+B |
A-203 |
Flat |
55.99 |
21.45 |
BOOKED |
0 |
0 |
0 |
No Encumbrance |
| A+B |
A-204 |
Flat |
55.99 |
28.9 |
UNBOOKED |
55,00,000 |
0 |
55,00,000 |
No Encumbrance |
| A+B |
A-301 |
Flat |
55.33 |
5.55 |
UNBOOKED |
55,00,000 |
0 |
55,00,000 |
No Encumbrance |
| A+B |
A-302 |
Flat |
55.33 |
5.55 |
BOOKED |
0 |
0 |
0 |
No Encumbrance |
| A+B |
A-303 |
Flat |
55.99 |
5.55 |
BOOKED |
0 |
0 |
0 |
No Encumbrance |
| A+B |
A-304 |
Flat |
55.99 |
6.58 |
BOOKED |
0 |
0 |
0 |
No Encumbrance |
| A+B |
A-401 |
Flat |
55.33 |
5.55 |
BOOKED |
0 |
0 |
0 |
No Encumbrance |
Showing first 25 of 122 units — full list in raw/form_three.json.
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
RMG INFRACARE PRIVATE LIMITED |
| Promoter Type |
COMPANY |
| PAN |
AANCR9634F |
| Company / Firm Registration No. |
U42903GJ2024PTC155206 |
| Date of Incorporation |
19-09-2024 |
| Status |
REGISTERED |
| Registered Address |
B/705, Atma House, Opp Reserve Bank, Ashram Road, Ahmedabad |
| Taluka / District / State |
Ahmedabad City / Ahmedabad / GUJARAT |
| Pin Code |
380009 |
| E-mail |
rmginfracare@gmail.com |
| Mobile |
9909596696 |
| Telephone |
— |
| Website |
— |
| Registered On |
02-08-2025 |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| RAJESHKUMAR MAGANBHAI GOLAVIYA |
AOLPG4157K |
9909596696 |
rmginfracare@gmail.com |
8, AJINATH CO-OP HOU. SOCIETY, NEAR WATER TANK, KARELIBAUG VADODARA |
Vadodara |
Vadodara |
GUJARAT |
390018 |
| SAHIL YOGESHKUMAR CHAUHAN |
AJWPC2060R |
7383490043 |
ashokarmg01@gmail.com |
B-22, RAGHUVIR CO OP SOCIETY, KARELIBAUG, VADODARA |
Vadodara |
Vadodara |
GUJARAT |
390018 |
2 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| SAHIL YOGESHKUMAR CHAUHAN |
AJWPC2060R |
7383490043 |
ashokarmg01@gmail.com |
B-22, RAGHUVIR CO OP SOCIETY, KARELIBAUG, VADODARA |
Vadodara |
Vadodara |
GUJARAT |
390018 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| SWASTIK ATHARV |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA16188/081225/310329 |
Residential/Group Housing |
New |
RMG INFRACARE PRIVATE LIMITED |
15-11-2025 |
31-07-2029 |
Ahmedabad |
Ahmedabad City |
| SWASTIK ASHOKA |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA16178/041225/310329 |
Residential/Group Housing |
New |
RMG INFRACARE PRIVATE LIMITED |
13-11-2025 |
31-07-2029 |
Ahmedabad |
Ahmedabad City |
| SWASTIK DEVKUNJ |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16160/281125/310329 |
Mixed Development |
New |
RMG INFRACARE PRIVATE LIMITED |
15-11-2025 |
31-07-2029 |
Ahmedabad |
Ahmedabad City |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Pincode |
Opening Balance (₹) |
Closing Balance (₹) |
| AXIS BANK |
ASHRAM ROAD |
RMG INFRACARE PRIVATE LIMITED RERA RETENTION BANK ACCOUNT SWASTIK DEVKUNJ |
926020027841539 |
UTIB0002642 |
Ahmedabad / Ahmedabad City |
380009 |
0 |
0 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
8 |
| Time Lapsed (%) |
15.14 |
| RERA Assessment |
Slow |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| April 2026 |
0.8 |
| July 2026 |
4.36 |
| October 2026 |
10 |
4.3 Block-wise Construction Progress
— (no records)
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
Nov-25 – Mar-26 |
31-03-2026 |
07-04-2026 |
07-04-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-2 |
Apr-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
15-07-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-3 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
07-10-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-4 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
ACTIVE |
— |
— |
— |
— |
| Q-5 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-6 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-7 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-8 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-9 |
Jan-28 – Mar-28 |
31-03-2028 |
07-04-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-10 |
Apr-28 – Jun-28 |
30-06-2028 |
07-07-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-11 |
Jul-28 – Sep-28 |
30-09-2028 |
07-10-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-12 |
Oct-28 – Dec-28 |
31-12-2028 |
07-01-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| X-1 |
Jan-29 – Mar-29 |
31-03-2029 |
07-04-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| BWA-1 |
Jun-26 – Jun-36 |
08-06-2036 |
08-06-2036 |
14-07-2026 |
SUBMITTED |
— |
— |
— |
— |
| BWA-2 |
Jul-26 – Jul-36 |
14-07-2036 |
14-07-2036 |
— |
ACTIVE |
— |
— |
— |
— |
| X-2 |
Apr-29 – Jun-29 |
30-06-2029 |
07-07-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Jul-29 – Jul-29 |
31-07-2029 |
31-07-2029 |
— |
ACTIVE |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2025-26 |
SUBMITTED |
31-10-2026 |
Form 5 PDF |
| 2026-27 |
INACTIVE |
— |
— |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16160/281125/310329 |
15-11-2025 |
28-11-2025 |
— |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2025-26 |
600627 |
31-10-2026 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| BCR |
BCR/0004095/26072026R2 |
26-07-2026 |
18-08-2026 |
— |
— |
— |
— |
— |
— |
Approved |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
Available |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
33 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/29254 |
ok |
| applications |
project_reg/public/projectAllApplications/29254 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/29254 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/29254 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/29254 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/29254 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/29254 |
ok |
| core |
project_reg/public/alldatabyprojectid/29254 |
ok |
| form_eight |
quarter/getformpdf-by-id/29254 |
ok |
| form_four |
quarter/get-by-project-id/29254 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/320650 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/29254/21271 |
ok |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/29254 |
ok |
| form_three |
formthree/public/getform-three-byid/443699 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/29254 |
ok |
| form_two |
formtwo/public/getform-two-by-id/171053 |
ok |
| joint_development |
project_reg/public/land-owner/project29254 |
ok |
| location |
maplocation/public/getProjectLocations/29254 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/29254 |
ok |
| profile |
project_reg/public/getproject-details/29254 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/29254 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/29254 |
ok |
| promoter |
user_reg/promoter/promoter22962 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/29254 |
ok |
| qpr_progress |
quarter/get-project-progress/29254 |
ok |
| quarters |
quarter/public/getprojectqtrs/29254 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/251115/029254 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.
SINDUR VIENNA
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA16457/110226/310728
Project ID: 29742
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Residential/Group Housing
Promoter: C.N INFINITY LLP (LIMITED LIABILITY PARTNERSHIP FIRM)
Registered On: 11-02-2026
Declared Completion: 30-11-2028
Construction Progress (as published): 2% (Slow)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:06
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
SINDUR VIENNA |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA16457/110226/310728 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/260104/029742 |
| Project Address |
SINDUR VIENNA, AMBAWADI |
| Moje / Village |
CHHADAWAD |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
GUJARAT |
| Pin Code |
380006 |
| Project Type |
Residential/Group Housing |
| About Property |
RESIDENTIAL HOSTEL BUILDING |
| Project Start Date |
01-10-2025 |
| Project End Date |
30-11-2028 |
| Project Land Area (sq m) |
1254 |
| Total Open Area (sq m) |
530.61 |
| Total Covered Area (sq m) |
723.39 |
| Total Carpet Area (sq m) |
2563.95 |
| Carpet Area Range (sq m) |
2563.95 – 2563.95 |
| Total Units |
1 |
| Plan Passing Authority |
Ahmedabad Municipal Corporation |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS — · Block — · TP 3 (ELLISBRIDGE ( CHHADAWAD SECTION )) · FP 750/3 |
| Project Status |
New |
| Project Cost (₹) |
₹ 12,00,00,000 (Form 2-A + 2-B estimates) |
| Unit Price Range (₹) |
₹ 42,06,30,000 – ₹ 42,06,30,000 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Other |
A (HOSTEL) |
1 |
0 |
1 |
2563.95 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| A (HOSTEL) |
0 |
1 |
0 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
C.N INFINITY LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AAUFC4476C |
| Registration No. |
ACK0789 |
| Office Address |
9, SARDAR PATEL, NEAR GITA MANDIR RAIPUR Ahmedabad City Ahmedabad GUJARAT 380001 |
| E-mail |
pateldhanraj22@gmail.com |
| Mobile |
9979122922 |
| Partners / Associates |
12 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
11 |
| Total Complied Quarters |
2 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
2 |
| Total Complied Annual Compliance |
1 |
| Total Annual Compliance Defaulted |
1 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
KALUPUR COMMERCIAL COOPERATIVE BANK |
| Branch |
PATRAKAR COLONY |
| Account Name |
C N INFINITY LLP RERA COLLECTION BANK ACCOUNT FOR SINDUR VIENNA |
| Account Number |
01120102576 |
| IFSC |
KCCB0PCR011 |
| District / Taluka |
Ahmedabad / Ahmedabad City |
| Pincode |
380013 |
1.6 Construction Booking Status
| Block |
Block Progress (%) |
Form-B Report (%) |
Un-booked Units |
Development Period |
| FLAT |
53.13 |
0 |
— |
25-06-2019 → 30-06-2026 |
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA16457/110226/310728 |
04-01-2026 |
11-02-2026 |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2025-26 |
191609 |
18-10-2026 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| A (HOSTEL) |
11,00,00,000 |
60,00,000 |
5 |
10,40,00,000 |
03-01-2026 |
| Form 2-B — common infrastructure |
1,00,00,000 |
0 |
0 |
1,00,00,000 |
03-01-2026 |
| Total |
12,00,00,000 |
60,00,000 |
5 |
11,40,00,000 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
SINDUR VIENNA, AMBAWADI |
| Moje |
CHHADAWAD |
| Revenue Survey No. |
— |
| City Survey No. |
— |
| Block No. |
— |
| TP / Scheme |
3 / ELLISBRIDGE ( CHHADAWAD SECTION ) |
| Final Plot No. |
750/3 |
| Approving Authority |
Ahmedabad Municipal Corporation |
| Land Area for Project (sq m) |
1254 |
| Total Land Area of Layout (sq m) |
1254 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
71 / 1117.85 |
| Parking for Sale (nos) |
0 |
| Open Parking Area (sq m) |
0 |
| Map Coordinates |
23.017052112499886, 72.5541322201544; 23.01708173658942, 72.55448358953535; 23.016754636906732, 72.55447151959478; 23.016738590486792, 72.55413356125891; 23.01705087816268, 72.55412149131834 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Not published |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
Local Authority |
| Swimming Pool Capacity |
— |
| Water Supply Flag |
Yes |
| Sewage Disposal Flag |
Yes |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| Other |
1 |
0 |
2563.95 |
0 |
0 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
| Jiken Sureshkumar Mevada |
CA/2017/86584 |
9662264800 |
arc@smevada.in |
80 |
6 |
3, Pushpanjali Complex, B/h Navrang School |
Structural Engineer(s)
| Name |
Licence No. |
PAN |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| VIJAY ASHVINKUMAR MEHTA |
001SE19032700199 |
ABCPM8163D |
9427030100 |
vamstrdes@gmail.com |
75 |
23 |
27/135 HAPPYHOME APRTMENT |
ACTIVE |
Chartered Accountant(s)
— (no records)
Contractor(s)
— (no records)
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| A (HOSTEL) |
01-10-2025 |
30-07-2028 |
15.25 |
3142.4 |
5298.05 |
07201/180725/A9487/R0/M1 |
01-10-2025 |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
302483 |
| Form Status |
UPLOADED |
| Architect |
JIKEN SURESHKUMAR MEVADA |
| COA Registration No. |
CA/2017/86584 |
| Valid Till |
31-12-2028 |
| Physical Site Visit Date |
28-01-2026 |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
01-10-2025 |
| Project End |
31-07-2028 |
| Remark |
— |
| Submitted On |
28-01-2026 |
Form 1-A — Work Completed per Block
| Block |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| A (HOSTEL) |
80 |
25 / 1 |
0 |
0 |
0 / 6 |
0 |
0 |
0 |
0 |
0 |
Form 1-A — Construction Schedule: Block A (HOSTEL)
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
01-10-2025 |
28-02-2026 |
— |
— |
| Plinth |
01-03-2026 |
30-06-2026 |
— |
— |
| Podium |
— |
— |
— |
— |
| Stilt |
— |
— |
— |
— |
| Slab / RCC |
01-07-2026 |
30-09-2027 |
— |
— |
| Internal Finishing |
01-10-2026 |
31-12-2027 |
— |
— |
| Sanitary Fittings |
01-03-2028 |
31-03-2028 |
— |
— |
| Staircase |
01-05-2026 |
31-10-2027 |
— |
— |
| External Development |
01-08-2027 |
31-01-2028 |
— |
— |
| Installation |
01-12-2027 |
31-03-2028 |
— |
— |
| Common Area |
— |
— |
— |
— |
1 site progress photograph attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
225659 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
Remarks |
| Internal Road |
YES |
01-01-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Water Supply |
YES |
01-02-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Sewerage |
YES |
01-10-2027 |
31-05-2028 |
0 |
AS PER PLAN |
| Storm Water Drains |
YES |
01-10-2027 |
31-03-2028 |
0 |
AS PER PLAN |
| Landscaping |
YES |
01-05-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Street Lighting |
YES |
01-04-2028 |
30-04-2028 |
0 |
AS PER PLAN |
| Community Buildings |
NO |
— |
— |
0 |
— |
| Treatment And Disposal |
YES |
01-04-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Solid Waste Management |
YES |
01-04-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Water Conservation |
YES |
01-11-2027 |
31-05-2028 |
0 |
AS PER PLAN |
| Energy Management |
NO |
— |
— |
0 |
— |
| Fire Protection |
YES |
01-01-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Electrical Meter Room |
YES |
01-02-2028 |
30-04-2028 |
0 |
AS PER PLAN |
| Fire Fighting |
YES |
01-01-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Drinking Water Facilities |
YES |
01-03-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Emergency Evacuation |
YES |
01-01-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Use Of Renewable Energy |
YES |
01-03-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Security |
YES |
01-04-2028 |
31-05-2028 |
0 |
AS PER PLAN |
| Letter Box |
YES |
01-05-2028 |
31-05-2028 |
0 |
AS PER PLAN |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| A (HOSTEL) |
HOSTEL -105 |
Other |
2563.95 |
0 |
UNBOOKED |
42,06,30,000 |
0 |
42,06,30,000 |
No Encumbrance |
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
C.N INFINITY LLP |
| Promoter Type |
LIMITED LIABILITY PARTNERSHIP FIRM |
| PAN |
AAUFC4476C |
| Company / Firm Registration No. |
ACK0789 |
| Date of Incorporation |
24-10-2024 |
| Status |
REGISTERED |
| Registered Address |
9, SARDAR PATEL, NEAR GITA MANDIR RAIPUR |
| Taluka / District / State |
Ahmedabad City / Ahmedabad / GUJARAT |
| Pin Code |
380001 |
| E-mail |
pateldhanraj22@gmail.com |
| Mobile |
9979122922 |
| Telephone |
— |
| Website |
— |
| Registered On |
02-01-2026 |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| DARSHAN DIPAKBHAI PATEL |
CPYPP7653D |
9408133618 |
ddp467@gmail.com |
6, TANISHQ RESEDER NEAR AMIRAJ FARM, SOLA |
Daskroi |
Ahmedabad |
GUJARAT |
380060 |
| SANJAY BHARATBHAI PATEL |
ABDPP0166C |
9979880947 |
sanjay.p7972@gmail.com |
601, SINDUR SPACE, OPP. ARJUN GREEN VARDAN TOWER ROAD, NARANPURA |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380063 |
| SAGARKUMAR PANKAJKUMAR PARIKH |
AZPPP0269A |
8200164473 |
sagarparikh26@gmail.com |
14, RUDRAVAN SOCIETY, OPP. SOMESHWAR PARK 3 NEAR HOTEL GRAND CAMBAY, THALTEJ |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380054 |
| JIGNESH MAHENDRABHAI PATEL |
ACCPP5283G |
9898397100 |
mgdevelopers851@gmail.com |
596, MOTO VAS, OPP. PARABDI VAS NAVA VADAJ |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380013 |
| LUV UPENDRAKUMAR PATEL |
CSFPP5049D |
9737474487 |
luvpatel333@gmail.com |
A-204, SAGAR SANGIT COMPLEX 1 SCIENCE CITY ROAD, FUN POINT CLUB, SOLA |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380061 |
| PARESHBHAI HARGOVINDBHAI PATEL |
AAYPP7254K |
9825020808 |
pareshasu@gmail.com |
11, PARISHRAM BANK OF INDIA CO-OP SOCIETY NEAR VIJAYNAGAR SCHOOL, NARANPURA |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380013 |
| AJAY PATEL |
ABEPP0505E |
9825175177 |
gandhiinfra@yahoo.com |
23, GRAND SUPER CITY NEAR HARE KRISHNA TAMPLE, SANTEJ |
Kalol (G) |
Gandhinagar |
GUJARAT |
382721 |
| KUSH VINODKUMAR PATEL |
EBWPP8884E |
9737879733 |
patel.kushkush@gmail.com |
B-301, AARYA VRUND, NEAR SILVER CRUST OPP RATNAM BUNGLOWS, SCIENCE CITY ROAD, SOLA |
Daskroi |
Ahmedabad |
GUJARAT |
380060 |
| C N INFRASPACE LLP |
AATFC2357D |
9879909566 |
vasudev.patel78@gmail.com |
17, Vijay Colony Society, Opp. Sardar Patel Colony, Navjivan, Naranpura |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380014 |
| AP FUTURESPACE LLP |
ACHFA1576E |
9825044425 |
aap.050473@gmail.com |
House No. D, Gulmahor Velly, Near Datt Avenue Science City, Sola |
Daskroi |
Ahmedabad |
GUJARAT |
380060 |
| DHANRAJ TUSHARBHAI PATEL |
BKHPP0643Q |
9979122922 |
pateldhanraj22@gmail.com |
PLOT NO. 17-A, ANURAG, SHILPGRAM 1 LILAPUR JASPUR GAM ROAD, VISHWA UMIYADHAM, JASPUR |
Kalol (G) |
Gandhinagar |
GUJARAT |
382721 |
| BHARATKUMAR VITTHALBHAI PATEL |
AHBPP1639A |
9426002884 |
mgdevelopers851@gmail.com |
9, JAGNIRMAN SOCIETY, B/H NAVRANG SCHOOL NARANPURA |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380013 |
12 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| AKASH ARVINDBHAI PATEL |
AMEPP0400F |
9825430849 |
akash098.ap@gmail.com |
17/B, VIJAY COLONY NEAR SARDAR PATEL BAVALA, NARANPURA |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380013 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| SINDUR VIENNA |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA16457/110226/310728 |
Residential/Group Housing |
New |
C.N INFINITY LLP |
01-10-2025 |
30-11-2028 |
Ahmedabad |
Ahmedabad City |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Pincode |
| KALUPUR COMMERCIAL COOPERATIVE BANK |
PATRAKAR COLONY |
C N INFINITY LLP RERA RETENTION BANK AC FOR SINDUR VIENNA |
01120800004 |
KCCB0PCR011 |
Ahmedabad / Ahmedabad City |
380013 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
6 |
| Time Lapsed (%) |
10.29 |
| RERA Assessment |
Slow |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| July 2026 |
37.33 |
| October 2026 |
50.43 |
4.3 Block-wise Construction Progress
| Block |
Development Start |
Development End |
Block Progress (%) |
Form-B Report (%) |
Form-B Period |
| FLAT |
25-06-2019 |
30-06-2026 |
53.13 |
0 |
25-06-2019 → 30-06-2026 |
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
Feb-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
07-07-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-2 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
06-10-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-3 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
ACTIVE |
— |
— |
— |
— |
| Q-4 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-5 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-6 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-7 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-8 |
Jan-28 – Mar-28 |
31-03-2028 |
07-04-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-9 |
Apr-28 – Jun-28 |
30-06-2028 |
07-07-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| X-1 |
Jul-28 – Sep-28 |
30-09-2028 |
07-10-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Oct-28 – Nov-28 |
30-11-2028 |
30-11-2028 |
— |
ACTIVE |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2025-26 |
SUBMITTED |
18-10-2026 |
Form 5 PDF |
| 2026-27 |
INACTIVE |
— |
— |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/RAA16457/110226/310728 |
04-01-2026 |
11-02-2026 |
— |
— |
— |
— |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2025-26 |
191609 |
18-10-2026 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
Available |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
46 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/29742 |
ok |
| applications |
project_reg/public/projectAllApplications/29742 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/29742 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/29742 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/29742 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/29742 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/29742 |
ok |
| core |
project_reg/public/alldatabyprojectid/29742 |
ok |
| form_eight |
quarter/getformpdf-by-id/29742 |
ok |
| form_four |
quarter/get-by-project-id/29742 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/302483 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/29742/21506 |
ok |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/29742 |
ok |
| form_three |
formthree/public/getform-three-byid/432955 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/29742 |
ok |
| form_two |
formtwo/public/getform-two-by-id/167235 |
ok |
| joint_development |
project_reg/public/land-owner/project29742 |
ok |
| location |
maplocation/public/getProjectLocations/29742 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/29742 |
ok |
| profile |
project_reg/public/getproject-details/29742 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/29742 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/29742 |
ok |
| promoter |
user_reg/promoter/promoter23711 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/29742 |
ok |
| qpr_progress |
quarter/get-project-progress/29742 |
ok |
| quarters |
quarter/public/getprojectqtrs/29742 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/260104/029742 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.
Godrej Altus
GujRERA Registration No.: PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16636/240326/071131
Project ID: 30461
District / Taluka: Ahmedabad / Ahmedabad City
Project Type: Mixed Development
Promoter: Godrej Properties Limited (COMPANY)
Registered On: 24-03-2026
Declared Completion: 07-11-2031
Construction Progress (as published): 2% (On Track)
Source: https://gujrera.gujarat.gov.in/#/project-preview
Scraped at: 02-11-2026 18:15
1. Project Summary
1.1 Project Details
| Field |
Value |
| Project Name |
Godrej Altus |
| GUJRERA Reg. No. |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16636/240326/071131 |
| Acknowledgement No. |
PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/260307/030461 |
| Project Address |
Nr. GMDC Building, 132 Feet Ring Road, Vastrapur |
| Moje / Village |
Vastrapur |
| Taluka |
Ahmedabad City |
| District |
Ahmedabad |
| State |
GUJARAT |
| Pin Code |
380015 |
| Project Type |
Mixed Development |
| About Property |
Residential Flats & Commercial Shops |
| Project Start Date |
26-02-2026 |
| Project End Date |
07-11-2031 |
| Project Land Area (sq m) |
12383 |
| Total Open Area (sq m) |
7640.9 |
| Total Covered Area (sq m) |
4742.1 |
| Total Carpet Area (sq m) |
23766.38 |
| Carpet Area Range (sq m) |
85.92 – 194.15 |
| Total Units |
148 |
| Plan Passing Authority |
Ahmedabad Municipal Corporation |
| Redevelopment Project |
— |
| Affordable Housing |
— |
| Survey / Block / TP Details |
RS 192 · Block — · TP 31 (University Campus) · FP 99 |
| Project Status |
New |
| Project Cost (₹) |
₹ 2,85,36,27,508 (Form 2-A + 2-B estimates) |
| Unit Price Range (₹) |
₹ 4,31,57,953 – ₹ 11,42,78,697 |
1.2 Unit Type / Inventory Details
| Unit Type |
Block |
Total Units |
Booked |
Un-booked |
Carpet Area (sq m) |
| Residential |
T1+T2+T3+T4 |
131 |
0 |
131 |
21596.58 |
| Shop |
T1+T2+T3+T4 |
17 |
0 |
17 |
2169.8 |
Block-wise booking status (portal chart data)
| Block |
Booked |
Un-booked |
Booked % |
| T1+T2+T3+T4 |
0 |
148 |
0 |
1.3 Promoter Details (summary)
| Field |
Value |
| Promoter Name |
Godrej Properties Limited |
| Promoter Type |
COMPANY |
| PAN |
AAACG3995M |
| Registration No. |
L74120MH1985PLC035308 |
| Office Address |
Godrej One, 5th Floor, Pirojshanagar, Eastern Express Highway Vikhroli (East), Mumbai Mumbai Mumbai City MAHARASHTRA 400079 |
| E-mail |
notice.gujarat@godrejproperties.com |
| Mobile |
7205814855 |
| Partners / Associates |
2 |
1.4 Compliance
| Field |
Value |
| Total Quarterly Compliance Required |
23 |
| Total Complied Quarters |
2 |
| Total Quarterly Compliance Defaulted |
0 |
| Total Annual Compliance Required |
2 |
| Total Complied Annual Compliance |
1 |
| Total Annual Compliance Defaulted |
1 |
1.5 Collection Bank Details (Section 4(2)(l)(D))
| Field |
Value |
| Bank |
HDFC BANK |
| Branch |
MAKARBA |
| Account Name |
GPL RERA Collection Bank Account for Godrej Altus |
| Account Number |
57500001848511 |
| IFSC |
HDFC0003920 |
| District / Taluka |
Ahmedabad / Ahmedabad City |
| Pincode |
380051 |
1.6 Construction Booking Status
— (no construction progress records published)
1.7 Status & RERA Applications
| Type |
Application No. |
Submitted |
Approved |
Promoter |
CA |
Final |
Complaint No. |
Challan No. |
Challan ₹ |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16636/240326/071131 |
07-03-2026 |
24-03-2026 |
— |
— |
— |
— |
— |
— |
| Complaint |
— |
01-07-2026 |
— |
— |
— |
— |
A/631/2026 |
— |
— |
| Complaint |
A/675/2026 |
13-07-2026 |
— |
— |
— |
— |
A/675/2026 |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2029-30 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2030-31 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
| Annual Compliance |
2025-26 |
129402 |
31-10-2026 |
ACCEPTED |
ESIGNED |
SUBMITTED |
— |
— |
— |
| Annual Compliance |
2031-32 |
— |
— |
— |
— |
INACTIVE |
— |
— |
— |
1.8 Estimated Cost & Work Done (Form 2)
| Block |
Estimated Cost (₹) |
Cost Incurred (₹) |
Work Done (%) |
Balance Cost (₹) |
As On |
| T1+T2+T3+T4 |
2,80,36,27,508 |
6,50,00,000 |
2 |
2,73,86,27,508 |
28-02-2026 |
| Form 2-B — common infrastructure |
5,00,00,000 |
0 |
0 |
5,00,00,000 |
28-02-2026 |
| Total |
2,85,36,27,508 |
6,50,00,000 |
2.28 |
2,78,86,27,508 |
— |
2. Project Profile
2.1 Location & Land Details
| Field |
Value |
| Address (as registered) |
Nr. GMDC Building, 132 Feet Ring Road, Vastrapur |
| Moje |
Vastrapur |
| Revenue Survey No. |
192 |
| City Survey No. |
— |
| Block No. |
— |
| TP / Scheme |
31 / University Campus |
| Final Plot No. |
99 |
| Approving Authority |
Ahmedabad Municipal Corporation |
| Land Area for Project (sq m) |
12383 |
| Total Land Area of Layout (sq m) |
12383 |
| Total Carpet Area for Sale (sq m) |
— |
| Covered Parking (nos / sq m) |
766 / 16047.21 |
| Parking for Sale (nos) |
78 |
| Open Parking Area (sq m) |
485.06 |
| Map Coordinates |
23.043446276841784, 72.53753857755062; 23.042774927213667, 72.53813134574291; 23.042399759787642, 72.53798114203808; 23.04199497270872, 72.53743933581707; 23.0425626615615, 72.53671245717403 |
| Water Level / Soil Report Date |
— / — |
| Joint Development Agreement |
Not published |
2.2 Development Details
| Field |
Value |
| Road System Developed By |
Self Development |
| Water Supply By |
Self Development |
| Sewage & Drainage By |
Self Development |
| Electricity & Transformer By |
Self Development |
| Solid Waste Management By |
Self Development |
| Drinking Water Requirement (litres) |
— |
| Water Proposed |
— |
| Sewage Quantity (litres) |
— |
| Sewage Treatment Source |
— |
| Solid Waste Source |
Local Authority |
| Swimming Pool Capacity |
221125.00 |
| Water Supply Flag |
Yes |
| Sewage Disposal Flag |
Yes |
Inventory declared in development plan
| Type of Inventory |
No. of Units |
Booked |
Carpet Area (sq m) |
Exclusive Area (sq m) |
Open Terrace (sq m) |
| Shop |
17 |
0 |
2169.8 |
0 |
0 |
| Flat |
131 |
0 |
21596.58 |
3512.32 |
0 |
2.3 Professionals Associated
Architect(s)
| Name |
Local Authority Licence No. |
Mobile |
E-mail |
Key Projects Completed |
Address |
| Caleb Glen Ferro |
CA/2015/69608 |
7486024228 |
calebferro.architects@gmail.com |
45 |
A-203, Satej Apartments, Opp |
Structural Engineer(s)
| Name |
Licence No. |
PAN |
Mobile |
E-mail |
Key Projects Completed |
Experience (years) |
Address |
Status |
| KUNAL NARENKUMAR SUTHAR |
TDO/STDR/386 |
CPQPS0688B |
9825711982 |
kunalnsuthar@gmail.com |
40 |
15 |
307, C-2, Gangotri Appartment, |
ACTIVE |
Chartered Accountant(s)
— (no records)
Contractor(s)
— (no records)
Real Estate Agent(s)
— (no records)
2.4 Blocks / Buildings
| Block |
Work Start |
Work End |
Height (m) |
FSI (sq m) |
Built-up Area (sq m) |
Commencement Certificate No. |
Certificate Date |
Issuing Authority |
| T1+T2+T3+T4 |
26-02-2026 |
07-11-2031 |
44.6 |
33857.15 |
64816.23 |
07649/130619/A2433/R2/M1 |
26-02-2026 |
— |
2.5 Form 1 — Architect's Certification
| Field |
Value |
| Form 1 ID |
305752 |
| Form Status |
UPLOADED |
| Architect |
CALEB GLEN FERRO |
| COA Registration No. |
CA/2015/69608 |
| Valid Till |
31-12-2026 |
| Physical Site Visit Date |
06-03-2026 |
| Progress Reported (%) |
— |
| Time Lapsed |
— |
| Project Start |
26-02-2026 |
| Project End |
07-11-2031 |
| Remark |
— |
| Submitted On |
06-03-2026 |
Form 1-A — Work Completed per Block
| Block |
Excavation |
Plinth |
Podiums |
Stilt Flooring |
RCC Slabs |
Internal |
Staircases |
Sanitary |
External |
Installation |
| T1+T2+T3+T4 |
1 |
0 / 2 |
0 |
0 |
0 / 12 |
0 |
0 |
0 |
0 |
0 |
Form 1-A — Construction Schedule: Block T1+T2+T3+T4
| Stage |
Planned Start |
Planned End |
Actual Start |
Actual End |
| Excavation |
26-02-2026 |
31-12-2026 |
— |
— |
| Plinth |
01-01-2027 |
30-06-2028 |
— |
— |
| Podium |
— |
— |
— |
— |
| Stilt |
01-07-2028 |
31-12-2028 |
— |
— |
| Slab / RCC |
01-01-2029 |
30-06-2030 |
— |
— |
| Internal Finishing |
01-02-2029 |
31-01-2031 |
— |
— |
| Sanitary Fittings |
01-01-2031 |
30-06-2031 |
— |
— |
| Staircase |
01-02-2029 |
31-08-2030 |
— |
— |
| External Development |
01-06-2029 |
31-05-2031 |
— |
— |
| Installation |
01-01-2029 |
30-06-2031 |
— |
— |
| Common Area |
— |
— |
— |
— |
1 site progress photograph attached to Form 1-A — listed under Documents.
Form 1-B — Common Amenities & Infrastructure
| Field |
Value |
| Form B ID |
227602 |
| Amenity / Facility |
Applicable |
Planned Start |
Planned End |
Work Done (%) |
Remarks |
| Internal Road |
YES |
01-06-2031 |
30-09-2031 |
0 |
— |
| Water Supply |
YES |
01-03-2031 |
31-08-2031 |
0 |
— |
| Sewerage |
YES |
01-03-2031 |
31-08-2031 |
0 |
— |
| Storm Water Drains |
YES |
01-03-2031 |
31-08-2031 |
0 |
— |
| Landscaping |
YES |
01-08-2031 |
30-09-2031 |
0 |
— |
| Street Lighting |
YES |
01-08-2031 |
30-09-2031 |
0 |
— |
| Community Buildings |
NO |
— |
— |
0 |
— |
| Treatment And Disposal |
YES |
01-03-2031 |
31-08-2031 |
0 |
— |
| Solid Waste Management |
YES |
01-10-2031 |
31-10-2031 |
0 |
— |
| Water Conservation |
YES |
01-03-2031 |
31-08-2031 |
0 |
— |
| Energy Management |
YES |
01-02-2031 |
31-07-2031 |
0 |
Space for D.G. Set |
| Fire Protection |
YES |
01-02-2031 |
31-07-2031 |
0 |
— |
| Electrical Meter Room |
YES |
01-02-2031 |
31-07-2031 |
0 |
— |
| Fire Fighting |
YES |
01-02-2031 |
31-07-2031 |
0 |
— |
| Drinking Water Facilities |
YES |
01-03-2031 |
31-08-2031 |
0 |
— |
| Emergency Evacuation |
YES |
01-02-2031 |
31-07-2031 |
0 |
Fire Lift |
| Use Of Renewable Energy |
YES |
01-02-2031 |
31-07-2031 |
0 |
Solar |
| Security |
YES |
01-09-2031 |
31-10-2031 |
0 |
— |
| Letter Box |
YES |
01-09-2031 |
31-10-2031 |
0 |
— |
2.6 Form 3 — Inventory Snapshot
| Block |
Flat / Unit No. |
Usage |
Carpet Area (sq m) |
Balcony (sq m) |
Status |
Consideration (₹) |
Received (₹) |
Balance (₹) |
Encumbrance |
| T1+T2+T3+T4 |
T1-103 |
Residential |
127.09 |
15.84 |
UNBOOKED |
4,31,57,953 |
0 |
4,31,57,953 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-203 |
Residential |
127.09 |
15.84 |
UNBOOKED |
4,31,57,953 |
0 |
4,31,57,953 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-301 |
Residential |
128.05 |
15.95 |
UNBOOKED |
4,34,81,041 |
0 |
4,34,81,041 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-302 |
Residential |
169.58 |
18.53 |
UNBOOKED |
5,68,00,129 |
0 |
5,68,00,129 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-303 |
Residential |
127.09 |
15.84 |
UNBOOKED |
4,31,57,953 |
0 |
4,31,57,953 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-401 |
Residential |
128.05 |
15.95 |
UNBOOKED |
4,34,81,041 |
0 |
4,34,81,041 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-402 |
Residential |
169.58 |
18.53 |
UNBOOKED |
5,68,00,129 |
0 |
5,68,00,129 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-403 |
Residential |
127.09 |
15.84 |
UNBOOKED |
4,31,57,953 |
0 |
4,31,57,953 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-501 |
Residential |
128.05 |
15.95 |
UNBOOKED |
4,34,81,041 |
0 |
4,34,81,041 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-502 |
Residential |
169.58 |
18.53 |
UNBOOKED |
5,68,00,129 |
0 |
5,68,00,129 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-503 |
Residential |
127.09 |
15.84 |
UNBOOKED |
4,31,57,953 |
0 |
4,31,57,953 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-601 |
Residential |
128.05 |
15.95 |
UNBOOKED |
4,34,81,041 |
0 |
4,34,81,041 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-602 |
Residential |
169.58 |
18.53 |
UNBOOKED |
5,68,00,129 |
0 |
5,68,00,129 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-603 |
Residential |
127.09 |
15.84 |
UNBOOKED |
4,31,57,953 |
0 |
4,31,57,953 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-701 |
Residential |
128.05 |
15.95 |
UNBOOKED |
4,34,81,041 |
0 |
4,34,81,041 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-702 |
Residential |
169.58 |
18.53 |
UNBOOKED |
5,68,00,129 |
0 |
5,68,00,129 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-703 |
Residential |
127.09 |
15.84 |
UNBOOKED |
4,31,57,953 |
0 |
4,31,57,953 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-801 |
Residential |
128.05 |
15.95 |
UNBOOKED |
4,34,81,041 |
0 |
4,34,81,041 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-802 |
Residential |
169.58 |
18.53 |
UNBOOKED |
5,68,00,129 |
0 |
5,68,00,129 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-803 |
Residential |
127.09 |
15.84 |
UNBOOKED |
4,31,57,953 |
0 |
4,31,57,953 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-901 |
Residential |
128.05 |
15.95 |
UNBOOKED |
4,34,81,041 |
0 |
4,34,81,041 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-902 |
Residential |
169.58 |
18.53 |
UNBOOKED |
5,68,00,129 |
0 |
5,68,00,129 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-903 |
Residential |
127.09 |
15.84 |
UNBOOKED |
4,31,57,953 |
0 |
4,31,57,953 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-1001 |
Residential |
128.05 |
15.95 |
UNBOOKED |
4,34,81,041 |
0 |
4,34,81,041 |
No Encumbrance |
| T1+T2+T3+T4 |
T1-1002 |
Residential |
169.58 |
18.53 |
UNBOOKED |
5,68,00,129 |
0 |
5,68,00,129 |
No Encumbrance |
Showing first 25 of 148 units — full list in raw/form_three.json.
3. Promoters
3.1 Promoter Profile
| Field |
Value |
| Promoter Name |
Godrej Properties Limited |
| Promoter Type |
COMPANY |
| PAN |
AAACG3995M |
| Company / Firm Registration No. |
L74120MH1985PLC035308 |
| Date of Incorporation |
08-02-1985 |
| Status |
REGISTERED |
| Registered Address |
Godrej One, 5th Floor, Pirojshanagar, Eastern Express Highway Vikhroli (East), Mumbai |
| Taluka / District / State |
Mumbai / Mumbai City / MAHARASHTRA |
| Pin Code |
400079 |
| E-mail |
notice.gujarat@godrejproperties.com |
| Mobile |
7205814855 |
| Telephone |
— |
| Website |
— |
| Registered On |
24-07-2025 |
3.3 Partners / Associates
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| Pirojsha Adi Godrej |
ADTPG8791J |
7205814855 |
secretarial@godrejproperties.com |
Godrej One, 5th Floor, Pirojshanagar, Eastern Express Highway Vikhroli (East), Mumbai |
Mumbai |
Mumbai City |
MAHARASHTRA |
400079 |
| Gaurav Pandey |
APDPP0659J |
7205814855 |
secretarial@godrejproperties.com |
Godrej One, 5th Floor, Pirojshanagar, Eastern Express Highway Vikhroli (East), Mumbai |
Mumbai |
Mumbai City |
MAHARASHTRA |
400079 |
2 associate(s) / partner(s) registered against the promoter.
3.4 Authorised Signatory
| Name |
PAN |
Mobile |
E-mail |
Address |
Taluka |
District |
State |
Pin |
| Anshuman Nanda |
AVXPN9455G |
7205814855 |
anshuman.nanda@godrejproperties.com |
Godrej Properties Limited, 2nd Floor, Tower E, Westgate S.G. Highway, Ahmedabad |
Ahmedabad City |
Ahmedabad |
GUJARAT |
380015 |
| ISHWENDRA SINGH JHALA |
ALBPJ8488R |
9998723436 |
rera.gpdl@godrejproperties.com |
Godrej One, 5th Floor, Pirojshanagar, Eastern Express Highway Vikhroli (East), Mumbai, |
Mumbai |
Mumbai City |
MAHARASHTRA |
400079 |
3.5 Previous / Other Projects by the Promoter
| Project |
Registration No. |
Type |
Status |
Promoter |
Start |
End |
District |
Taluka |
| Godrej Altus |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16636/240326/071131 |
Mixed Development |
New |
Godrej Properties Limited |
26-02-2026 |
07-11-2031 |
Ahmedabad |
Ahmedabad City |
3.6 Project Bank Accounts
| Bank |
Branch |
Account Name |
Account No. |
IFSC |
District / Taluka |
Pincode |
Opening Balance (₹) |
Closing Balance (₹) |
| HDFC BANK |
MAKARBA |
GPL RERA Retention Bank Account for Godrej Altus |
57500001847047 |
HDFC0003920 |
Ahmedabad / Ahmedabad City |
380051 |
0 |
0 |
4. Progress & RERA Actions
4.1 Construction Progress Score
| Field |
Value |
| Overall Progress (%) |
2 |
| Architect Reported Progress (%) |
— |
| Engineer Reported Progress (%) |
3 |
| Time Lapsed (%) |
0.38 |
| RERA Assessment |
On Track |
4.2 Quarterly Progress Reported by Promoter
| Quarter |
Reported Progress (%) |
| July 2026 |
0.6 |
| October 2026 |
1 |
4.3 Block-wise Construction Progress
— (no records)
4.4 Quarterly Compliance (QPR) Timeline
| Quarter |
Period |
Due |
Extended Till |
Submitted On |
Status |
Default |
Penalty (₹) |
Enquiry |
Authority Remark |
| Q-1 |
Mar-26 – Jun-26 |
30-06-2026 |
07-07-2026 |
07-07-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-2 |
Jul-26 – Sep-26 |
30-09-2026 |
07-10-2026 |
07-10-2026 |
SUBMITTED |
— |
— |
— |
— |
| Q-3 |
Oct-26 – Dec-26 |
31-12-2026 |
07-01-2027 |
— |
ACTIVE |
— |
— |
— |
— |
| Q-4 |
Jan-27 – Mar-27 |
31-03-2027 |
07-04-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-5 |
Apr-27 – Jun-27 |
30-06-2027 |
07-07-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-6 |
Jul-27 – Sep-27 |
30-09-2027 |
07-10-2027 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-7 |
Oct-27 – Dec-27 |
31-12-2027 |
07-01-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-8 |
Jan-28 – Mar-28 |
31-03-2028 |
07-04-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-9 |
Apr-28 – Jun-28 |
30-06-2028 |
07-07-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-10 |
Jul-28 – Sep-28 |
30-09-2028 |
07-10-2028 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-11 |
Oct-28 – Dec-28 |
31-12-2028 |
07-01-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-12 |
Jan-29 – Mar-29 |
31-03-2029 |
07-04-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-13 |
Apr-29 – Jun-29 |
30-06-2029 |
07-07-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-14 |
Jul-29 – Sep-29 |
30-09-2029 |
07-10-2029 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-15 |
Oct-29 – Dec-29 |
31-12-2029 |
07-01-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-16 |
Jan-30 – Mar-30 |
31-03-2030 |
07-04-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-17 |
Apr-30 – Jun-30 |
30-06-2030 |
07-07-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-18 |
Jul-30 – Sep-30 |
30-09-2030 |
07-10-2030 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-19 |
Oct-30 – Dec-30 |
31-12-2030 |
07-01-2031 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-20 |
Jan-31 – Mar-31 |
31-03-2031 |
07-04-2031 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-21 |
Apr-31 – Jun-31 |
30-06-2031 |
07-07-2031 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-22 |
Jul-31 – Sep-31 |
30-09-2031 |
07-10-2031 |
— |
INACTIVE |
— |
— |
— |
— |
| Q-E |
Oct-31 – Nov-31 |
07-11-2031 |
07-11-2031 |
— |
ACTIVE |
— |
— |
— |
— |
4.5 Annual Compliance (Form 5)
| Financial Year |
Status |
Submitted On |
Document |
| 2025-26 |
SUBMITTED |
31-10-2026 |
Form 5 PDF |
| 2026-27 |
INACTIVE |
— |
— |
4.6 RERA Applications, Complaints & Penalties
| Type |
Application No. |
Submitted |
Approved |
Complaint No. |
Complaint Status |
Challan No. |
Challan ₹ |
Challan Status |
Judgment No. |
Final Status |
| Registration |
PR/GJ/AHMEDABAD/AHMEDABAD CITY/Ahmedabad Municipal Corporation/MAA16636/240326/071131 |
07-03-2026 |
24-03-2026 |
— |
— |
— |
— |
— |
— |
— |
| Complaint |
— |
01-07-2026 |
— |
A/631/2026 |
— |
— |
— |
— |
— |
— |
| Complaint |
A/675/2026 |
13-07-2026 |
— |
A/675/2026 |
HEARING_SCHEDULE |
— |
— |
— |
— |
— |
| Annual Compliance |
2026-27 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2027-28 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2028-29 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2029-30 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2030-31 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
| Annual Compliance |
2025-26 |
129402 |
31-10-2026 |
— |
— |
— |
— |
— |
— |
SUBMITTED |
| Annual Compliance |
2031-32 |
— |
— |
— |
— |
— |
— |
— |
— |
INACTIVE |
4.7 Enquiry & Escalation Flags
| Field |
Value |
| Quarterly Enquiry (QE) Active |
No |
| Form 8 (Annual Report) Document |
Available |
| Form 3 Loan Details |
Not published |
5. Documents Downloaded
28 file(s) downloaded, 0 unavailable. Files are stored in files/ next to this report.
6. Source & Method Appendix
Data was collected from the public GujRERA endpoints that power #/project-preview. No authentication, CAPTCHA or bulk-scraping bypass was used — each request is the same one a normal visitor's browser makes.
| Endpoint |
Path |
Result |
| annual_compliance |
form_five/get-formfive-records-till-date/30461 |
ok |
| applications |
project_reg/public/projectAllApplications/30461 |
ok |
| area_price |
dashboard/get-all-view-unit-details-by-id/30461 |
ok |
| block_chart |
dashboard/get-all-block-chart-details-by-id/30461 |
ok |
| block_progress |
dashboard/project-block-progress-dtl-by-prj-id/30461 |
ok |
| blocks |
project_reg/project-app/getproject-blocklist/30461 |
ok |
| collection_bank |
project_reg/public/bank/get_col_account/30461 |
ok |
| core |
project_reg/public/alldatabyprojectid/30461 |
ok |
| form_eight |
quarter/getformpdf-by-id/30461 |
ok |
| form_four |
quarter/get-by-project-id/30461 |
ok |
| form_one |
formone/public/getfrom-one-byformone-id/305752 |
ok |
| form_one_noc |
formone/public/project/noc/getnoc-by-proj-proid-type/30461/21799 |
portal returned HTTP 5xx |
| form_one_photos |
formone/public/getfrom-one-photos-byformone-id/30461 |
portal returned HTTP 5xx |
| form_three |
formthree/public/getform-three-byid/434709 |
ok |
| form_three_loan |
formthree/public/getform-three-loan-details/30461 |
ok |
| form_two |
formtwo/public/getform-two-by-id/168252 |
ok |
| joint_development |
project_reg/public/land-owner/project30461 |
ok |
| location |
maplocation/public/getProjectLocations/30461 |
ok |
| previous_projects |
project_reg/public/getprev-project-list/30461 |
ok |
| profile |
project_reg/public/getproject-details/30461 |
ok |
| progress_score |
project_reg/public/getProjectProgressReports-ByPrjRegId/30461 |
ok |
| project_banks |
project_reg/public/project-app/getproject-banks/30461 |
ok |
| promoter |
user_reg/promoter/promoter22816 |
ok |
| qe_enquiry |
quarter/getQEEnquiryStatus/30461 |
ok |
| qpr_progress |
quarter/get-project-progress/30461 |
ok |
| quarters |
quarter/public/getprojectqtrs/30461 |
ok |
| scanned_docs |
vdms/gujreraapi/api/GetACK?AckNo=PR/AHMEDABAD/AHMEDABAD CITY/AHMEDABAD MUNICIPAL CORPORATION/260307/030461 |
ok |
Raw JSON responses are stored in raw/ and the document manifest in documents_manifest.json.